Bexar County, Texas is soliciting bids for the 2025 Water Main Replacement Project 5, a four-site water infrastructure replacement initiative with bids due December 31, 2026.

The project installs approximately 3,409 linear feet of 8-inch HDPE water mains across four locations within the county. Site 1 (Nottingham Drive and Tophill Road, Bartell Drive to Greenwich Boulevard) requires 881 feet installed via pipe bursting and 10 feet via open trench. Site 2 (Northridge Drive and Larkwood Drive, Crandall Place to Kenilworth Boulevard) requires 580 feet via pipe bursting and 186 feet via open trench. Site 3 (Shadylane, E Terra Alta to Forest Glen) requires 997 feet via open trench. Site 4 (Larchmont Drive and Irvington Drive, Greenwich Boulevard to Kenilworth Boulevard) requires 951 feet via pipe bursting. Work includes alley segments between parallel streets at sites 1, 2, and 4. The project addresses deteriorating water mains with a documented history of failures as part of the county's ongoing main replacement program approved in 2025.

No estimated contract value, specific evaluation criteria, pre-bid meeting date, questions-due date, anticipated award date, or incumbent contractor information is provided in the source material.

Opportunity text

Site 1 - Nottingham Dr and Tophill Rd from Bartell Dr to Greenwich Blvd. About the Project This package has four site locations. Project site one will install approximately 881 feet of 8-inch HDPE water mains by pipe bursting, and 10 feet by open trench construction methods. Project site one includes an alley between Nottingham Dr and Tophill Rd from Bartell Dr to Greenwich Blvd. Water Main Replacement Project 5, which was approved in 2025, is part of ongoing efforts to replace deteriorating water mains that have a history of failures. Site 2 - Northridge Dr and Larkwood Dr from Crandall Pl to Kenilworth Blvd. About the Project This package has four site locations. Project site two will install approximately 580 feet of 8-inch HDPE water mains by pipe bursting, and 186 feet by open trench construction methods. Project site two includes an alley between Northridge Dr and Larkwood Dr from Crandall Pl to Kenilworth Blvd. Water Main Replacement Project 5, which was approved in 2025, is part of ongoing efforts to replace deteriorating water mains that have a history of failures. Site 3 - Shadylane from E Terra Alta to Forest Glen About the Project This package has four site locations. Project site three will install approximately 997 feet of 8-inch HDPE water mains by open trench construction methods. Project site three includes Shadylane from E Terra Alta to Forest Glen. Water Main Replacement Project 5, which was approved in 2025, is part of ongoing efforts to replace deteriorating water mains that have a history of failures. Site 4 - Larchmont Dr and Irvington Dr from Greenwich Blvd to Kenilworth Blvd About the Project This package has four site locations. Project site three will install approximately 951 feet of 8-inch HDPE water mains by pipe bursting methods. Project site four includes an alley between Larchmont Dr and Irvington Dr from Greenwich Blvd to Kenilworth Blvd. Water Main Replacement Project 5, which was approved in 2025, is part of ongoing efforts to replace deteriorating water mains that have a history of failures.