NCWRF Finished Water Pump and Chemical Improvements
Closed State & local contract opportunity Posted
- Solicitation number
- PE-33100-NONST-2024-000000003
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- 28564 Motor Controllers, Contactors, Push Button Stations, Relays, Safety Switches, Starters, Coils And Brushes
- 67075 Valves, Iron Body: Angle, Check, Gate, Globe, Etc.
- 72055 Proportioning Pumps: Chemical Feed, Metering, Positive Displacement, And Injector Pumps (See Also Class 820)
- 83032 Fiberglass Tanks (Other Than For Gasoline)
- 83044 Polyethylene Tanks
- 89007 Centrifuges, Water Treatment
- 91115 C.i.p., Construction/Rehabilitation, Other Than Buildings
- 91360 Construction, Water System/Plants, Main And Service Line
- 91438 Electrical
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
Paragraph 1:
The Columbus Water Works in Columbus, Georgia is seeking sealed bids for the North Columbus Water Resource Facility Finished Water Pump and Chemical Improvements project. The project includes replacing and upgrading various water pumping, chemical feeding, and ventilation systems at the North Columbus Water Resource Facility. Key deliverables include replacing the existing 6,000 gpm finished water pump with a new 9,000 gpm pump, upgrading the electrical systems, replacing the chlorine gas system with a new sodium hypochlorite feed system, relocating the existing powdered activated carbon (PAC) feed point, replacing the chlorine dioxide generation system, and replacing various chemical feed lines. Bids are due by 2:00 pm on May 23, 2024, and the work will be awarded in a single contract. Bidders must submit a 5% bid bond and demonstrate compliance with the American Iron and Steel Special Conditions, Supplemental General Conditions, and the Owner's goals for Minority Owned Firms (10%) and Women Owned Firms (5%) participation.
Paragraph 2:
The project is funded through the Georgia Environmental Finance Authority (GEFA), and bidders are required to comply with GEFA funding requirements. The Owner encourages participation of local businesses and contractors, but notes that this does not supersede the requirements for American Iron and Steel and GEFA compliance. The successful bidder will be required to furnish a 100% Performance Bond and Payment Bond. The Owner reserves the right to reject all bids and readvertise. While no incumbent vendors or current contractors are listed, the project requires integration with existing infrastructure and technology at the North Columbus Water Resource Facility.
Opportunity text
Sealed Bids for furnishing all materials, labor, tools, equipment & appurtenances necessary for the construction of the North Columbus Water Resource Facility Finished Water Pump and Chemical Improvements (Project No. 35774-87) will be received at the Columbus Water Works, 1421 Veterans Parkway, Columbus, Georgia 31901, until 2:00 p.m., local time, on May 23, 2024 and then at said location publicly opened & read aloud. The Project includes finished water pumping & chemical feed improvements at North Columbus Water Resource Facility in Columbus, Georgia including the following improvements: 1. Replacing the existing 6,000 gpm NCPS Pump No. 1 with a new 9,000 gpm pump, motor, and electrical conduit and wiring. 2. Upgrading the electrical systems at the North Columbus Pump Station and High Service Pump Station as shown on the Drawings. 3. Replacement of existing chlorine gas system with new 12% bulk sodium hypochlorite feed system, including 6 fiberglass reinforced plastic (FRP) bulk storage tanks, 3 day tanks, and twelve chemical feed pumps. 4. Relocation of the existing PAC feed point to the new Raw Water Chemical Feed Vault, including extension of feed piping in the new chemical trench/ductbank, replacement of the eductor, and replacement of the water booster pump, within the existing PAC silo. 5 Replacement of the existing chlorine dioxide generation system with a new generation system, including replacement of the sulfuric acid tank, feed pumps, & water booster pump, within the existing Chemical Building. 6. Replacement of pretreatment chemical feed lines, including alum, PAC, chlorine dioxide, liquid lime, polymer,& pre-chlorine (sodium hypochlorite), with Schedule 80 PVC in a new concrete chemical trench or duct ban. All chlorine gas solution lines will be replaced as part of the conversion to sodium hypochlorite. 7. Replace or modify the ventilation equipment in the Chlorine Storage Building & the basement of the Operations Building & as shown on drawings.
Files
| File | Type | Posted |
|---|---|---|
| 00 11 16 _ ADVERTISEMENT FOR BIDS.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities