Natural Gas Distribution Infrastructure Safety and Modernization LA FY23
Closed State & local contract opportunity Posted
- Solicitation number
- 693JK325400NGDI
- State
- Louisiana
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Town of Berwick, Louisiana is requesting sealed bids for natural gas distribution infrastructure replacement and modernization under Project No. 693JK325400NGDI, with bids due October 6, 2026 at 2:00 P.M. local time and a mandatory pre-bid conference on September 24, 2026 at 10:00 A.M.
The scope includes installing 2-inch MDPE gas lines along River Road and 4-inch MDPE gas lines in the North Berwick and Golden Farms Subdivisions; abandoning existing 2-inch PVC gas lines along River Road and 2-inch and 4-inch PVC gas lines in the North Berwick and Golden Farms Subdivisions; replacing gas meters, risers, and installing new gas valves across all three areas; and connecting existing 4-inch PE gas lines to non-active existing 4-inch PE gas lines along Thorguson Drive and Highway 182. Place of performance is the Town of Berwick, St. Martin Parish, Louisiana.
All bidders must submit a bid bond in the required amount with sureties acceptable per U.S. Department of Treasury Circular 570, along with a certificate of corporate principal and surety, any issued addenda, and a corporate resolution if applicable. The successful bidder must execute the contract within ten working days of award and begin mobilization and procurement within ten working days of receiving the Notice to Proceed. Bids may not be withdrawn for at least forty-five days after the scheduled closing time.
Contract documents are available for examination at Professional Engineering and Environmental Consultants, Inc., 46148 LA Highway 445, Robert, LA 70455, or electronically via www.centralbidding.com and james@peecinc.com. A one-hundred-fifty-dollar deposit is required to obtain a physical set of documents, refundable upon request. Sealed bids are submitted to Town Hall at 3225 3rd Street, Berwick, LA 70342 or electronically via www.centralbidding.com. Bids will be publicly opened and read aloud at 2:00 P.M. on October 6, 2026.
Opportunity text
The Scope of work for this project includes in- stalling new 2-inch MDPE Gas Lines along River Road and 4- inch MDPE Gas Lines in the North Berwick and Golden Farms Sub Divisions of the Town of Berwick. In result, this scope of work also includes abandoning the existing 2-inch PVC Gas Lines along River Road and abandoning the 2-inch and 4-inch PVC Gas Lines in the North Berwick and Golden Farms Sub Divisions; as well as replacing gas meters and risers and installing new gas valves in all three (3) areas of the total project. This project also includes the connection of the existing 4-inch PE Gas Lines to the Non-Active existing 4-inch PE Gas Lines along Thorguson Drive and Highway 182.
Files
| File | Type | Posted |
|---|---|---|
| lpn town of berwick gas line replacement.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity