N1015 Musculoskeletal Institute (MSI) Rehab Expansion
Awarded State & local contract opportunity Posted
- Solicitation number
- UCHC4-182076956
- State
- Connecticut
- Responses due
Opportunity facts
- Jurisdiction
- UNSPSC codes
- Point of contact
-
- Jonathan Wenger jwenger@uchc.edu (860) 679-8174
Opportunity details come from webprocure.proactiscloud.com. Updated .
About this opportunity
The UConn Health Center has issued an Invitation to Bid (ITB) for the N1015 Musculoskeletal Institute (MSI) Rehab Expansion project located in Farmington, Connecticut, within Hartford County. The procurement seeks a contractor to renovate approximately 1,000 square feet of ground floor space in the MSI building, with specific objectives including the removal of an existing rehabilitation pool, conversion of changing and shower rooms into treatment rooms, and reconfiguration of adjacent spaces to enhance clinical flow and program requirements. The solicitation is designated as Solicitation Number UCHC4-182076956 and is open to all vendors. Key procurement dates include a bid period from January 29, 2024, to February 26, 2024, with a mandatory pre-bid walkthrough scheduled for February 2, 2024, at 11:00 AM in the MSI building lobby. A vendor question and answer period will be conducted from January 30, 2024, to February 9, 2024, during which potential bidders can seek clarification about the project specifications. The delivery terms are specified as Free On Board Destination, with payment terms to be specified by the vendor. Supporting documentation includes a Project Manual, W9 form, construction drawings, and three addenda that provide additional project details.
The solicitation does not specify any set-aside designations or restrictions on the types of organizations that can respond, indicating the opportunity is open to all qualified vendors. No incumbent vendor information is provided, and there are no explicit requirements regarding disadvantaged enterprise participation. The documents do not disclose a specific budget range or estimated contract value for the renovation project. The project appears to involve integrating the renovation with existing infrastructure of the Musculoskeletal Institute, with a focus on expanding the existing rehabilitation program's clinical capabilities. Jonathan Wenger from UConn Health Center is listed as the primary contact for questions and bid submissions. Parking for the pre-bid walkthrough will be available in Garage 1, and interested contractors are required to review all accompanying documentation, including the Project Manual, construction drawings, and addenda, to fully understand the project scope and requirements.
Opportunity text
Renovate approximately 1,000 sf of space on the Ground floor of the Musculoskeletal Institute to expand the existing rehab program. The scope includes removal of an existing rehab pool and converting changing and shower rooms in to Treatment rooms and reconfiguration of adjacent spaces to meet the program requirements and clinical flow.