N-1, US-34 - Murdock - Grading, Bridge & Structures - Cass County
Open State & local contract opportunity Posted
- Solicitation number
- STP-HSIP-1-7(110)
- State
- Nebraska
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Gayle Dietz ndot.procurementsourcing@nebraska.gov (402) 471-4567
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Nebraska Department of Transportation is soliciting bids for grading, bridge, and structures work on US-34 near Murdock, with bids due October 29, 2026. The project involves construction of two bridge structures (S001 00266 and S001 00479) in the 2027 construction season, with both bridges required to open to two-lane, two-way traffic and new guardrail installed by December 1, 2027.
The contractor must install new guardrail prior to shifting traffic between construction phases or as directed by the Engineer. Existing guardrail on the traffic side shall remain in place during Phase 1 construction until Phase 2 begins. If existing guardrail at stations 410+58 to 416+33 (left and right) is removed in 2027, the contractor must install surfacing under guardrail and new guardrail by December 1, 2027, with the restriction that milled surfaces cannot remain exposed over the winter period.
The work is located in Cedar County (note: the jurisdiction listing shows Cedar County, though the description references Cass County). The bid notice does not disclose estimated contract value, contract term, set-asides, preference programs, evaluation criteria, or timeline details beyond the October 29 proposal deadline and December 1, 2027 completion requirement. Prospective bidders should obtain the complete bid package for pricing terms, bonding and insurance requirements, and funding source information.
Opportunity text
Description: Bridge structures S001 00266 and S001 00479 shall be constructed in the 2027 Construction season. These bridges must be opened to two-lane, two-way traffic with new guardrail installed by December 1, 2027. The Contractor shall be required to install new guardrail prior to shifting traffic to the next phase(s), completing the last phase, or as directed by the Engineer for all bridge structures. The Contractor shall also leave the existing guardrail in place on the traffic side during Phase 1 construction until Phase 2 construction begins. 4. If the existing guardrail at station 410+58 to station 416+33, left and right is removed in 2027, the Contractor shall install surfacing under guardrail and new guardrail by December 1, 2027 at these locations. Milled surfaces shall not be allowed to be present over the winter time period.
Files
| File | Type | Posted |
|---|---|---|
| Bid Notice-N-1_ US-34 - Murdock - Grading_ Bridge _ Structures - Cass County.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity