Myrtle Grove Fire Station 11 - Construction
Closed State & local contract opportunity Posted
- Solicitation number
- PD 25-26.096
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 90638 General Construction - Architectural
- 90921 Building Construction, Industrial (Warehouse, Etc.)
- 90924 Building Construction, Commercial And Institutional
- 90930 Building Construction (Not Otherwise Classified)
- 91220 Construction, Fire Protection (Includes Fire Escapes, Fire And Smoke Barriers, Firestops)
- Point of contact
-
- Kent Jensen kmjensen@myescambia.com (850) 595-4982
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
Escambia County Board of County Commissioners issued Invitation to Bid PD 25-26.096 for the complete construction of Escambia Fire-Rescue's Myrtle Grove Fire Station 11, with bids due September 25, 2026 at 10:00 a.m. The source includes no set-aside, local-vendor preference, or sole-source provision, and it requires that bidders be qualified and licensed contractors.
The work covers demolition of the existing station, site development, and construction of a new three-bay station of approximately 12,780 square feet for ten emergency response personnel at 7209 Lillian Highway, Pensacola, Florida 32506 (Parcel No. 11-2S-31-5300-000-000). The facility includes apparatus bays, administrative offices, bunk rooms, a day room with commercial kitchen, decontamination and SCBA rooms, and mechanical, electrical, plumbing, fire protection, communications, and life-safety systems. Bidders must submit lump-sum pricing with all fees and costs broken out. The contractor is responsible for permits, site security, and debris removal.
Bid security is a bid bond, certified check, or cashier's check for 5 percent of the total bid. The contractor must furnish Performance and Payment bonds covering up to 100 percent of the contract award value. Required insurance includes general liability of $1 million per occurrence and $2 million annual aggregate, business auto liability of $1 million per accident, and contractor's pollution liability of $1 million per occurrence and $2 million annual aggregate. An Installation Floater at full replacement cost is required, and Escambia County must be named as additional insured. Substantial completion is due within 365 consecutive calendar days of the Notice to Proceed, plus 30 days for final completion. Liquidated damages are $3,498 per calendar day. Bids remain subject to acceptance for ninety calendar days after opening.
A non-mandatory pre-bid meeting was held August 31, 2026 at 1:00 p.m. at the Office of Purchasing, and questions were due September 8, 2026. Addendum #2 (Revision) was posted September 18, 2026. Bid set drawings are dated August 20, 2026, and bid set specifications were posted August 21, 2026.
Opportunity text
The Escambia County Board of County Commissioners ("County") invites sealed bids from qualified and licensed contractors to furnish all labor, supervision, materials, equipment, transportation, permits, and incidentals necessary for the complete construction of the Escambia Fire-Rescue Myrtle Grove Station 11.
The Project consists of the demolition of the existing fire station, site development, and construction of a new approximately 12,780-square-foot, three-bay fire station designed to accommodate ten (10) emergency response personnel. As an essential public safety facility, the station has been designed to meet current operational requirements, resiliency standards, and applicable stormwater management criteria.
All work shall be performed in strict accordance with the Contract Documents, including the Drawings, Specifications, and all other requirements contained in this Invitation to Bid (ITB).
The Project site is located at 7209 Lillian Highway, Pensacola, Florida 32506, identified as Parcel No. 11-2S-31-5300-000-000.