Myakka river watershed management plan

Closed State & local contract opportunity Posted

Solicitation number
252771AMS
State
Florida
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 24
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

Sarasota County is seeking professional engineering firms to develop an updated Myakka River Watershed Management Plan and Best Management Practices Alternative Analysis through a Request for Professional Services (RPS). The project aims to comprehensively assess flood protection and water quality levels of service within the approximately 139-square-mile Myakka River Watershed, which ultimately discharges at Charlotte Harbor. Key deliverables include updating existing StormWise hydrological models, developing a Capital Improvement Program, and identifying at least ten cost-effective projects for flood protection and water quality improvements. The consultant must provide detailed technical analysis using an "intermediate-high" sea level rise projection for 2100, create conceptual design plans, develop associated models and GIS files, and prepare a planning-level Engineer Opinion of Probable Cost. The solicitation was posted on October 2, 2025, with proposals due by October 28, 2025, and the project is expected to be completed within 24 months. Interested vendors must register on the OpenGov Procurement platform and can submit questions through the platform's Q&A feature.

While no specific set-aside designations or disadvantaged enterprise requirements are explicitly mentioned, the contract requires extensive technical qualifications and specific insurance coverage. Required insurance includes Workers' Compensation, Business Automobile Liability, Commercial General Liability, and Professional Liability with specified minimum coverage limits. The project will utilize existing watershed models, specifically converting models from Interconnected Channel and Pond Routing (ICPR) Version 3 to Version 4, and incorporating recent LiDAR data from the Southwest Florida Water Management District. Previous technical reports by firms like Jones Edmunds & Associates and Collective Water Resources have laid groundwork for this comprehensive watershed management planning effort. Although a specific contract value is not disclosed, the extensive scope of work, which includes detailed hydrological modeling, water quality assessments, and infrastructure analysis, suggests a significant investment in understanding and improving the watershed's resilience and management.

Opportunity text

Request For Professional Services

Sarasota County seeks proposals from professional engineering firms to provide an updated Myakka River Watershed Management Plan and Best Management Practices Alternative Analysis.

The County anticipates awarding a CCNA Specific Project Agreement to run for the duration of the Project.

Refer to the Solicitation Documents and Attachments section for minimum qualifications, scope/specifications, and insurance requirements.

Files

File Type Posted
Attachment_A.pdf PDF
Attachment_B.pdf PDF
Solicitation_Documents.pdf PDF
Vendor_Outreach_Email.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors