Multi-Year Preventative Maintenance, Replacement Parts and Services of Andritz-Ruthner, Bird Machine, Netzsch, R & B and Humboldt products
Closed State & local contract opportunity Posted
- Solicitation number
- SS-26-056
- State
- Florida
- Responses due
Opportunity facts
Opportunity details come from tohowater.bonfirehub.com. Updated .
About this opportunity
The source does not identify the issuing body (state agency, county, city, school district, or authority). Without the specific procurement entity, I cannot write a summary following the required format, which mandates that the first sentence lead with "the specific issuing body (the state agency, county, city, school district, or authority — not just the state)."
The source provides only a solicitation title, posted and due dates (October 2 and October 16, 2026), and detailed preventative maintenance and parts-replacement service schedules for industrial equipment (Andritz-Ruthner, Bird Machine, Netzsch, R & B, and Humboldt products). It does not name the buying entity, the contract value, the location, evaluation criteria, or any set-aside or preference program.
To proceed, I would need the issuing body's name and jurisdiction.
Opportunity text
Quantity Product 3,000 Hour Service QTY (6): (3) 21,000 Hours (3) 27,000 Hours Control / Intervention Consumables / Parts General inspection Scroll thrust bearing greasing (1) Bearing grease Cyclo gearbox oil renewal and plug seals replacement Oil and 2 plug seals Oil filter replacement 1 Oil filter 24,000 Hour Service QTY (3) Control / Intervention Consumables / Parts General inspection Replacement of shock absorbers under the decanter 1 set of shock absorbers Replacement of shock absorbers under the motor 1 set of motor shock absorbers Flexible coupling replacement 1 flexible coupling Scroll thrust bearing greasing Bearing grease Cyclo gearbox oil renewal and plug seals replacement Oil and 2 plug seals Oil tank rinsing Oil filter replacement 1 oil filter Heat exchanger cartridge replacement 1 tubular cartridge Lubrication unit oil renewal EP 68 oil Replace belts 1 set of belts (1) 30,000 Hour Service QTY (3) Performed at Service Center Control / Intervention Consumables / Parts General inspection Disassembly, clean & inspect critical dimensions Control of parts subjected to abrasion: - Control of scroll conveyor wear (inspection - Replacement of scroll nozzles - Replacement of solid output nozzle wear 1 set of scroll nozzles 1 set of output nozzles Bearings overhaul 1 set of bearings and seals (scroll, feed end, drive end main bearings) Scroll thrust bearing greasing Bearing grease Cyclo gearbox unit exchange 1 set of screws 1 cyclo gearbox exchange unit (or replacement of all internal parts) Cyclo gearbox oil renewal and plug seals replacement Oil and 2 plug seals Oil filter replacement 1 oil filter Oil return bellows replacement 2 oil return bellows Lubrication unit oil renewal EP 68 oil Replace belts 1 set of belts (1)
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity