About this opportunity

The City of Santa Cruz Department of Public Works is requesting sealed bids on the MRF Paving and Stormwater Improvements project with bids due September 2, 2026 at 2:00 p.m. local time, and a non-mandatory pre-bid conference on August 19, 2026 at 10:30 a.m. at the project site.

The scope consists of demolition, excavation, grading, and installation of 4-inch asphalt concrete pavement over an 8-inch aggregate base; 6-inch Schedule 80 PVC pipe with connections to existing dual-wall HDPE infrastructure; concrete curbing; drainage inlets and catch basins; and associated earthwork and erosion control measures. The contractor must transport three 20,000-gallon frac tanks to the new pad and complete all work within 45 calendar days. All PVC pipe must be coated with enamel paint per specifications. The project is located at 605 Dimeo Lane, Santa Cruz, California 95060.

Contractors must hold a valid California Class A General Engineering license at bid submittal and contract award. All contractors and subcontractors must register with the California Department of Industrial Relations and comply with prevailing wage requirements under Labor Code sections 1725.5 and 1771.1. The project is subject to Santa Cruz Municipal Code Chapter 3.10 local hiring provisions; bidders must provide good faith effort documentation.

Bid security must be submitted as a certified check, cashier's check, or bidder's bond in an amount not less than 10 percent of the proposal. The successful bidder must provide a Faithful Performance Bond and Labor and Material Bond each equal to 100 percent of the contract price within 10 calendar days of award. Progress payments are subject to 5 percent retention withholding until 35 calendar days after notice of completion is recorded. Liquidated damages are $500 per calendar day for delays beyond the deadline unless caused by unforeseeable circumstances beyond the contractor's control. Hard copy bid submittal only is required. Bidding documents are available through the City of Santa Cruz Procurement Portal at https://procurement.opengov.com/portal/santacruzca. The project is not federally funded.

Opportunity text

The project consists of construction of the MRF Paving and Stormwater Improvements per plans. The Contractor shall provide and pay for labor, materials, construction equipment, tools, facilities, and services necessary for proper execution, testing, and completion of the Work. The completed work will provide the City with a pad for the location of stormwater storage/treatment tanks and a new pipe alignment to divert stormwater to these tanks. The above description of the Work is for general information only; and in no way limits the responsibility of the Contractor for accomplishing the Work in strict accordance with the Contract Documents.

*HARD COPY SUBMITTAL ONLY*