MoDOT SE Signal Pole Emergency Replacement - Sikeston, MO in New Madrid County
Awarded State & local contract opportunity Posted
- Solicitation number
- IFB605SE21001418
- State
- Missouri
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Juli Smith juli.smith@modot.mo.gov (573) 472-5231
Opportunity details come from webprocure.proactiscloud.com. Updated .
About this opportunity
The Missouri Department of Transportation (MoDOT) Southeast District is seeking a vendor to perform an emergency signal pole replacement and repair project at the intersection of Route 61 and Larcel Drive in New Madrid County, Sikeston, MO. The procurement involves removing a damaged signal pole base, installing a new base, and reinstalling wires and pole according to project specifications. The project requires comprehensive traffic control, mobilization, installation of 22 linear feet of 3-inch rigid conduit, 3.67 cubic yards of concrete base, and relocation of the existing signal pole and wiring. Contractors are encouraged to visit the project site during bid preparation and can contact Chris Medley at 417-252-0631 for site visit arrangements. The bid solicitation was posted on March 2, 2021, with bids due by March 9, 2021 at 8:00 AM CST, and all work must be completed before April 1, 2021. The contract will be awarded on an "All or Nothing" basis, with pricing quoted per item but awarded as a lump sum covering materials, labor, and mobilization costs. Liquidated damages of $500 per day will be assessed for late completion.
The solicitation encourages participation from Minority Business Enterprises (MBE) and Women Business Enterprises (WBE), with specific goals of 10% MBE and 5% WBE participation through subcontractors, suppliers, or joint ventures. Service-Disabled Veteran Enterprise (SDVE) vendors are also encouraged to participate. Contractors must maintain specific insurance coverage, including general liability insurance ($500,000 per person/$3,000,000 per occurrence), automobile liability insurance with the same limits, and workers' compensation coverage. The project requires compliance with MoDOT's Standard Specifications for Highway Construction and adherence to OSHA standards and safety apparel requirements. While no specific incumbent vendor is mentioned, the solicitation indicates the project stems from a signal pole damaged by a motorist. Payment terms are set at Net 30 days, and the total estimated project value is not explicitly stated in the procurement documents. Vendors must submit bids electronically through the MissouriBUYS procurement system, with hard copy submissions requiring prior approval.
Opportunity text
The Missouri Department of Transportation in the Southeast (SE) District is seeking a vendor to provide a signal pole replacement and repair on Route 61 and Larcel Drive intersection in New Madrid County. Current pole and base was damaged by a motorist. The contractor will need to remove the damaged base and install new base and reinstall the wires and pole, as shown in the plans. The contractor will utilize a work zone to perform this repair work as shown in the plans. Contractors are encouraged to visit the project site during the bid preparation process. For bidder questions or to make an appointment to view the sites prior to submitting a quote, please contact Chris Medley at 417-252-0631.
Files
Show all 37
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity