Mizpah Road Full Depth Reclamation
Awarded State & local contract opportunity Posted
- Solicitation number
- Grady001-082022
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Stacy Watkins stacy@watkinseng.com (229) 388-8823
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The Grady County Board of Commissioners awarded a contract to Scruggs Concrete on September 20, 2022 for Mizpah Road Full Depth Reclamation, a roadway construction project in Georgia. This opportunity has closed — the sealed-bid deadline was September 20, 2022 at 11:00 a.m. local time.
All bidders were required to hold pre-qualified Georgia Department of Transportation contractor status, with license numbers clearly displayed on the bid envelope. This certification requirement filtered eligibility.
The scope encompassed full depth reclamation of approximately 3.81 miles of Mizpah Road, including blending of existing asphalt surface with the top six inches of base, addition of Portland cement, installation of new asphalt driving surface, striping, and erosion control measures. The work was awarded as a single contract with a 180 consecutive calendar day construction schedule.
Bidding documents were available for purchase at $300.00 per set (non-refundable) from Watkins & Associates, L.L.C., 1606 Whiddon Mill Road, Tifton, Georgia 31793, or could be examined at the Grady County Board of Commissioners' office during business hours. No bid could be withdrawn for 60 days following the bid closing.
Opportunity text
Sealed Bids: Sealed Bids for the construction of the Pine Park Road Improvements Phase 2 will be received, by Grady County Board of Commissioners, at the Grady County Board of Commissioners' Office, 33 17th Avenue NW, Cairo, GA 39827, until 11:00 A.M., Tuesday, September 20, 2022 local time, at which time the Bids received will be publicly opened and read. No bid may be withdrawn after the closing time for receipt of bids for a period of sixty (60) days. Contractor License: Any Contractor submitting a bid must be a pre-qualified Georgia Department of Transportation Contractor. License numbers must be written on the face of the bid envelope. No bid will be opened unless the license number is clearly shown. See Instructions to Bidders for additional bidding requirements. Work to Be Done: The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed Mizpah Road Full Depth Reclamation as shown on the construction drawings. In general, construction consists of +/- 3.81 miles of full depth reclamation to include blending of existing asphalt surface with top six inches of base, addition of Portland cement, new asphalt driving surface, striping and erosion control and all associated measures for the complete project. This work will be awarded in one (1) contract with a 180 consecutive calendar day construction schedule. Plans and Bidding Documents: Copies of Bidding Documents for bidding purposes can be obtained from Watkins & Associates, L.L.C., 1606 Whiddon Mill Road, Tifton, Georgia 31793, Phone: (229) 388-8823, (Office of the Engineer) upon payment of $300.00 for each set (non-refundable). Prospective Bidders may examine the Bidding Documents at the Grady County Board of Commissioners, located at Grady County Board of Commissioners' Office, 33 17th Avenue NW, Cairo, GA 39827 or at Watkins & Associates, LLC on Mondays through Fridays between the hours of 8 A.M. and 5 P.M.
Files
| File | Type | Posted |
|---|---|---|
| Award Information | — |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity