Mid- Farfield AIDS Project - Renovation & Expansion
Open State & local contract opportunity Posted
- Solicitation number
- 25288
- State
- Connecticut
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Aidan Migani ajm@omarchitects.com
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Mid-Fairfield AIDS Project, Inc. is soliciting lump-sum bids under an Invitation for Bid for selective demolition and hazardous-material abatement at 7 Moore Place in Norwalk, Connecticut, with bids due December 7, 2026 at 2:00 PM and a mandatory prebid walkthrough on November 20, 2026 at 10:00 AM. No set-aside or eligibility restriction applies. Bidders are strongly encouraged to use subcontractors and vendors certified as SBE, MBE, WBE, DBE, or Veteran-Owned, and CHRO compliance is required.
The work prepares Buildings A and B for renovation. It includes removing asbestos-bearing transite panels, HVAC duct insulation, universal waste, lead-based paint, PCB-bearing paint, and an interior oil tank. Interior work covers wall finishes, ceiling finishes, flooring, and underlayment. Exterior work removes roofing and siding in selective 48-inch-by-48-inch sections, and temporary weathertight covering is required for 12 months after completion. Additional scope includes camera scoping of underground storm and sanitary lines and soil borings at four locations for a planned Building B addition. Before contract execution, the awardee must provide a certificate of insurance naming the organization as additional insured, a workers' compensation certificate, and an AIA Document A305 Contractor's Qualification Statement. Prevailing wage requirements do not apply.
The bid is a lump sum across five itemized divisions: General Conditions, Demolition & Waste Disposal, Hazardous Material Removal & Disposal, Camera Scoping, and Soil Borings. The contract period is 120 calendar days, with liquidated damages of $500 per calendar day for delays. No contract value is stated.
Questions are due by 5:00 PM on November 30, 2026, and an addendum will be emailed to all mandatory walkthrough attendees on December 2, 2026. Bids are submitted by email to Stuart Lane, Executive Director and Owner Representative, at slane@mfap.com, with "7 Moore Place Selective Demolition Bid" in the subject line. Bid documents are available from the Owner Representative on request. The organization may waive defects, reject any or all bids, cancel the RFP, and decline to award to any bidder.
Opportunity text
MID-FAIRFIELD AIDS PROJECT, INC. 7 MOORE PLACE SELECTIVE DEMOLITION INVITATION FOR BID
Bids for a General Contract for Construction for the Mid-Fairfield AIDS Project, Inc., Selective Demolition at 7 Moore Place, Norwalk, Connecticut, will be received by the Mid-Fairfield AIDS Project, Inc., until 2:00 PM on Monday, December 7, 2026. Bids shall be submitted by email to Stuart Lane, Executive Director and Owner Representative, at slane@mfap.com. No bids will be received after said hour. Bidders will be notified by email of the bid results by the Owner Representative. A MANDATORY Prebid Walkthrough will be conducted at the Project Site at 10:00 AM on Friday, November 20, 2026. Electronic copies of the bid documents and information may be obtained by requesting them from the Owner Representative. All email communications to the Owner Representative shall include 7 Moore Place Selective Demolition Bid, in the subject line. The bidding schedule is summarized as follows:
11/13/26 Friday Invitation for Bid listed with Construction Bid Source Construction Documents available from Owner Representative
11/20/26 Friday Mandatory Prebid Walkthrough on-site at 10:00 AM
11/30/26 Monday Bidders questions submitted to Owner Representative by 5:00 PM
12/2/26 Wednesday Addendum emailed to all Mandatory Prebid Walkthrough attendees
12/7/26 Monday Bids due at 2:00 PM
Mid-Fairfield AIDS Project, Inc., reserves the right to waive any defects and informality in the bidding, or in any bid to reject any or all bids for any reason whatsoever and to accept that bid deemed to be in the best interest of the organization. Mid-Fairfield AIDS Project, Inc., reserves the right to cancel the RFP and to decline to issue a new RFP. Mid-Fairfield AIDS Project, Inc., reserves the right to decline to award a contract to any of the bidders.
SCOPE DESCRIPTION
The work of this Contract is intended to prepare for the renovation of Buildings A and B at 7 Moore Place by removing existing materials to be replaced and by uncovering concealed existing conditions that may impact the planned renovation. Refer to hazardous materials reports and abatement specifications for more detail than is provided in the outline below. The work scope includes the following:
1.00 Remove, abate, remediate the following hazardous materials in Building A:
1.01 Asbestos-bearing transite panels in basement Mechanical Room.
1.02 Asbestos-bearing HVAC duct insulation on first and second floors.
1.03 Universal Waste: fluorescent lamps and ballasts, halogen lamp, window AC unit, fire alarms, and mercury thermostats.
1.04 Remove existing interior oil tank.
1.05 Lead-based paint on affected materials.
2.00 Remove, abate, remediate the following hazardous materials in Building B:
2.01 Asbestos-bearing black foundation waterproofing at all exterior walls.
2.02 Asbestos-bearing black waterproofing at basement stair wall.
2.03 PCB-bearing light green paint on CMU wall.
2.04 Universal Waste: halogenated lamp and ballasts, fire alarms, and mercury thermostat.
3.00 Remove and dispose of the following interior materials in Buildings A and B:
3.01 Interior wall finishes down to studs. Remove any thermal insulation found in exterior walls.
3.02 Interior ceiling finishes to exposed joists.
3.03 Interior flooring and underlayment down to subfloor.
4.00 Remove and dispose of the following exterior materials in Buildings A and B:
4.01 48 inch-by-48 inch section of roofing materials down to roof sheathing in up to four (4) locations per building. Provide secure temporary weathertight covering after inspection by Architect. Temporary covering shall remain intact and weathertight for a minimum of 12 months after project completion.
4.02 48 inch-by-48 inch section of siding materials down to wall sheathing in up to four (4) locations per building. Provide secure temporary weathertight covering after inspection by Architect. Temporary covering shall remain intact and weathertight for a minimum of 12 months after project completion.
5.00 Inspect and conduct exploratory camera scoping of underground storm and sanitary lines:
5.01 Inspect two on-site catch basins, which are shown on survey drawing included in 90% Complete Construction Drawing Set. Camera-scope existing underground storm lines. Provide illustrated report on existing conditions, including determination of underground pipe locations.
5.02 Camera-scope existing underground sanitary lines. Provide illustrated report on existing conditions, including determination of underground pipe locations.
6.00 Soil Borings at Building B:
6.01 Engage a geotechnical subcontractor to implement soil borings at four (4) locations where the new addition is planned at Building B. Depth of borings shall exceed planned depth of new foundations. Refer to the 90% Complete Construction Drawing set for the location and dimensions of the planned new foundation. Mark proposed locations of soil borings and review with Architect before proceeding.
CONTRACT DOCUMENTS
The work of this Contract is delineated in this Bid Proposal form and the following documents:
1.00 Drawings:
1.01 Refer to the 90% Complete Construction Drawing Set for context and design intent.
2.00 Specification Sections and Reports from the 90% Complete Project Manual for the 7 Moore Place Housing Renovation:
2.01 01 1000 General Requirements
2.02 01 7400 Construction Waste Management
2.03 02 3000 Subsurface Investigation
2.04 02 4100 Demolition
2.05 02 6000 Hazardous Materials Remediation
2.06 Appendix A - Hazardous Material Report, Building A
2.07 Appendix B Hazardous Material Report, Building B
2.08 Appendix C Hazardous Material Report, Oil Tank & Catch Basins
2.09 Appendix D Hazardous Material Removal Specification
2.10 Refer to the 90% Complete Project Manual for the 7 Moore Place Housing Renovation.
PRIME CONTRACTORS REQUIREMENTS
SBE/MBE/WBE/DBE/VETERANS
Bidders are strongly encouraged to select subcontractors and vendors that are certified Small Business Enterprises, Minority Business Enterprises, Womens Business Enterprises, Disadvantaged Business Enterprises, and Veteran-Owned Businesses. Bidders shall indicate on their proposed list of Subcontractors which of these certifications each Subcontractor holds. CHRO compliance is required. See attached Commission on Human Rights and Opportunities Contract Compliance Regulations Notification to Bidders.
WAGE RATES
Prevailing wage rate requirements DO NOT apply to this project.
INSURANCE
The successful Bidder is required to submit to Mid-Fairfield AIDS Project, Inc., both a Certificate of Insurance (including Builder's Risk) and a Workers' Compensation Certificate on or before the signing of the Contract. The Certificate of Insurance shall name Mid-Fairfield AIDS Project, Inc., as an additional insured.
STATEMENT OF BIDDERS QUALIFICATIONS
Each Bidder is required to submit AIA Document A305, Contractors Qualification Statement, with their bid.
COMPLIANCE WITH REQUIREMENTS
Contracts will not be awarded until the above requirements have been submitted and approved
ADDITIONAL REQUIREMENTS
Please be aware that the Owner, prior to the awarding of the Contract, may require further financial and other information from any applicant who becomes the low bidder for that Contract.
Files
| File | Type | Posted |
|---|---|---|
| RFP Selective Demo -11.13.26_MFAP.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity