MIA South Terminal Employee Restroom Renovation
Open State & local contract opportunity Posted
- Solicitation number
- MCC 7360 RPQ No DA051A
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Miami-Dade Aviation Department is requesting bids for renovation of employee restrooms at Miami International Airport's South Terminal, with bids due November 18, 2026. The scope encompasses selective interior demolition and comprehensive renovation of male and female restrooms and a janitor closet, including electrical, mechanical, plumbing, and limited structural work.
Demolition includes interior wall and floor finishes, selected doors and frames, ceiling and mounted devices, electrical receptacles and switches, mechanical exhaust and louvers, plumbing fixtures and accessories, and alarm systems. Renovation deliverables include new toilet compartments and accessories, wall, floor, and ceiling finishes, plumbing fixtures, doors and frames, and new electrical, mechanical, and plumbing systems and accessories. Contractors must comply with all MDAD-provided plans and documentation, MCC 7360 standard construction contract conditions, required permits and inspections, and applicable federal, state, and local codes and regulations.
Minor variations necessary to complete the intended work are considered incidental and warrant no additional compensation. Major variations encountered during construction will be compensated through contingency allowance accounts, dedicated allowance accounts, or change orders and must be completed without project delay.
The bid documents are available through Miami-Dade County's CIIS procurement system. Contract terms and conditions are governed by MCC 7360 General Contract Conditions.
Opportunity text
Scope of Work shall include, but not be limited to: Provide all labor, equipment and materials for the renovation of an existing employee restroom at MIA South Terminal including related electrical, mechanical, plumbing and limited structural work. Selective interior demolition for male/female restrooms and janitor closet including: interior wall and floor finishes, included selected doors/frames; ceiling, including lights and other ceiling mounted devices; electrical devices, receptacles, and switches; mechanical exhaust and louvers; plumbing fixtures and accessories; and alarm system. Interior renovation improvement for male/female restrooms and janitor closet including: new toilet compartments and accessories; new wall, floor and ceiling finishes; new plumbing fixtures; new doors and frames; and new electrical, mechanical, and plumbing fixtures and accessories. CONTRACTOR shall review all documents and scope of work provided by Miami-Dade Aviation Department (MDAD) for work to be completed. Please refer to the Plans for further description of the scope of work. Contractors must agree to perform all work in accordance with the scopes of work established by MDAD, the MCC 7360 contracts terms and conditions, all required permits and inspections and all applicable federal, state and local laws, codes and regulations. For the MCC 7360 General Contract Conditions, refer to the following link: https://intrax.miamidade.gov/ciis/STANDARD_CONSTRUCTION_GENERAL_CONTRACT_CONDITIONS_REVISED_7_1_2024 Any minor variation in the scope of work that is necessary to complete the intended work shall be considered incidental and will not warrant additional compensation. Any major variation encountered in the scope of work that is necessary to complete the intended work will be additional work and will be compensated through a contingency allowance account, dedicated allowance account, or change order. However, such major variation shall be completed without delay. Contractor shall use an adequate number of qualified workers who are thoroughly trained in the techniques required to properly complete the work specified. Contractor will own or have access to the equipment necessary and to meet all safety, insurance, and technical requirements of the owner and local, county, state, and federal regulating authorities. The grand total bid price shall be reflected on the RPQ Bid Form Attachment 5A.
Files
| File | Type | Posted |
|---|---|---|
| miami-dade CIIS - RPQ - INVITATION TO BID Friday_ October 16_ 2026 - 11_46_43 AM.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity