Mesa County Turner Gulch Mitigation Project

Open State & local contract opportunity Posted

Solicitation number
IFB-26-SW-TURNER
State
Colorado
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Mesa County, Colorado's Public Works Department is soliciting bids under Invitation for Bids IFB-26-SW-TURNER for the Turner Gulch Mitigation Project, with electronic bids due December 1, 2026 at 10:00 a.m. Mountain Time through the Rocky Mountain Bid System. Bidders must be pre-qualified with the Colorado Department of Transportation in General Construction work (Work Code #01) at or above the submitted bid amount, with documentation required at bid submission, and bids from non-qualified contractors may be considered non-responsive. The county considers bid preference for Mesa County resident bidders under its purchasing policy.

The project installs flood-mitigation best management practices to protect three properties from post-fire debris flows following the 2025 Turner Gulch Fire, at 246 16 1/10 Road, 275 16 1/10 Road, and 42575 Highway 141. Work covers 30 bid line items, including flood barrier bags, water bars, detention facility maintenance, rock check dams, reseeding, and lump-sum mobilization and contingency items. Quantities include 2,325 square yards of geotextile fabric, 1,500 square yards of seeding and mulching, and 1,000 cubic yards of sediment removal. Pricing uses unit prices and lump sums, and the engineer's cost estimate totals $33,653.01 as a reference.

Bidders must submit a bid bond equal to 5 percent of the total bid amount or a certified check. The successful bidder must furnish a Performance Bond and a Payment and Maintenance Bond, each equal to 100 percent of estimated aggregate payments. Insurance requirements include $1,000,000 combined single limit Commercial General Liability, $1,000,000 combined Comprehensive Automobile Liability, and Workers' Compensation as required by Colorado law.

A mandatory pre-bid conference was scheduled for September 3, 2026, at 9:30 a.m. Mountain Daylight Time at Mesa County Central Services, 200 South Spruce Street, Grand Junction. The contractor must commence work within ten calendar days of Notice to Proceed and complete all work by March 1, 2027. Inquiries go to KC Selleck, Contract Administrator, at 970.244.1812 or kc.selleck@mesacounty.us, or Carrie Slubowski, County Designated Representative, at 970.244.1811 or carrie.slubowski@mesacounty.us.

Opportunity text

The Turner Gulch project is aimed at installing Best Managment Practices to protect three properties from flood events post Turner Gulch Fire. The best management practices include: installation of water bars, maintaining detention facilities, installing flood barrier bags, rock check dams and reseeding.

Files

File Type Posted
biddoc.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors