Mercer 2025 Bridge Shotcrete Group

Closed State & local contract opportunity Posted

Solicitation number
97300
State
Pennsylvania
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Pennsylvania Department of Transportation is requesting bids for shotcrete lining construction at five bridge locations across Mercer County state routes under PennDOT Project 97300, with bids due September 3, 2026 at 11:00 a.m. Prequalification is required for all bidders, and 100% state funding applies with no federal participation.

The scope spans five separate sites on SR 4020, SR 3007, SR 3035, and SR 4004, encompassing shotcrete facing with reinforcement (ranging from 990 to 3,730 square feet per location), installation of 101 total 1.5-inch diameter PVC drain holes, and temporary stream diversion at each site. Contract line items also include mobilization, inspector's field office facilities, equipment packages, narrative scheduling, maintenance and protection of traffic, and electronic ticketing for concrete. Work is performed at specified segment and offset locations as detailed on approved drawings included in the bid package.

The estimated project cost range is $200,000 to $499,999.99. The contract includes mandatory special provisions addressing erosion and sediment pollution control, equal employment opportunity requirements, prevailing wage compliance, utility coordination, Buy America and Build America provisions, and right-to-know law obligations. Unmanned aircraft systems manufactured by covered foreign entities are prohibited. The bid package modifies multiple sections of PennDOT Publication 408 standards, including material control, legal relations, payment procedures, concrete pavement evaluation, and aggregate specifications. The project is administered through PennDOT's Electronic Contract Management System (ECMS); all addenda will be posted electronically, and no pre-bid meeting is scheduled. The notice to proceed is anticipated October 19, 2026, with required project completion by October 8, 2027.

Opportunity text

This project is the construction of shotcrete lining located at SR 4020/Segment 0040/Offset 1998 to SR 4020/Segment 0050/Offset 0200, SR 3007/Segment 0030/Offset 1016 to SR 3007/Segment 0030/Offset 1416, SR 3007/Segment 0110/Offset 2946 to SR 3007/Segment 0120/Offset 0200, SR 3035/Segment 0040/Offset 0281 to SR 3035/Segment 0040/Offset 0681, and SR 4004/Segment 0060/Offset 2749 to SR 4004/Segment 0070/Offset 0340 as indicated on the approved drawings included in the bid package.

Files

File Type Posted
837919padot97300.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity