About this opportunity

The Wisconsin National Guard Readiness Center has initiated a procurement opportunity for a stormwater drainage infrastructure improvement project located in Medford, Wisconsin, within Vernon County. The specific contract involves comprehensive reconstruction of an existing asphalt valley gutter in the public access parking lot, requiring contractors to perform multiple technical construction tasks. Key deliverables include saw cutting and removing existing asphalt pavement, removing a deteriorated sidewalk, constructing new concrete curb and gutter, installing a reinforced concrete valley gutter, creating a new sidewalk, and reconstructing asphalt pavement in patch areas. The project also mandates additional site restoration elements such as erosion control, backfilling, and complete site cleanup. The procurement was posted on January 6, 2022, with a formal proposal submission deadline of February 10, 2022, indicating a relatively condensed procurement timeline of approximately 35 days for potential bidders to prepare and submit comprehensive project proposals.

While specific set-aside designations are not explicitly detailed in the provided documentation, the project appears to be a standard public infrastructure improvement contract open to qualified commercial construction entities with demonstrated experience in municipal and state-level infrastructure renovation. The project is located in Mattoon Village within Vernon County, suggesting potential local contractor preference might be considered. No incumbent vendor information or specific budget range was disclosed in the original solicitation. The project's scope suggests a moderate-complexity infrastructure renewal effort that would likely require contractors with specialized concrete and asphalt construction capabilities, erosion control expertise, and experience working on state-managed facility improvement projects. Potential bidders would need to demonstrate technical competence in municipal construction standards, stormwater management infrastructure renovation, and site restoration techniques.

Opportunity text

The Wisconsin National Guard Readiness Center located in Medford, WI was constructed with an asphalt valley for stormwater drainage located in the public access parking lot. Over time, the asphalt valley has deteriorated to the point where corrective measures are required. The project will require construction of a reinforced concrete valley gutter to provide a better long-term drainage feature through the parking lot. More specifically, this project involves saw cutting and removal of asphalt pavement and removal of a deteriorated sidewalk. New construction items that are required include new concrete curb and gutter, reinforced concrete valley gutter, new sidewalk, and construction of new asphalt pavement in the patch area between the sawcut and valley gutter. The project also includes erosion control as necessary, backfilling, site / turf restoration, and site cleanup.