MD 202 (Landover Road) From MD 450 to 57th Avenue Geometric Improvements
Closed State & local contract opportunity Posted
- Solicitation number
- PG8575130
- State
- Maryland
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Alice Gao agao@mdot.state.md.us (410) 531-5533
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Maryland Department of Transportation is soliciting bids for geometric improvements and resurfacing of MD 202 (Landover Road) in Prince George's County from MD 450 to 57th Avenue, with proposals due September 3, 2026.
The project encompasses 0.71 miles overall, with resurfacing of 0.32 miles and ancillary improvements extending from approximately 150 feet south of MD 450 to the MD 295 northbound on/off ramps. Work includes fine milling and resurfacing all lanes; full-depth pavement construction; median reconstruction and widening; elimination of unsafe turn movements at one intersection; replacement of damaged sidewalk, curb, and gutter; ADA sidewalk ramps and entrances; concrete bus shelter pads; cleaning and replacement of drainage inlets, manholes, and pipe culverts; pavement markings; pedestrian signals at MD 202/Randolph Street and the MD 295 ramp; a retaining wall to support a relocated bus stop; and median landscaping.
The project is located in Prince George's County, Maryland. A detailed scope document (839699mddotPG8575130.pdf, 84 KB) is attached.
Opportunity text
This project, located in Prince Georges County, is for the rehabilitation and resurfacing of a portion of MD 202 (Landover Road). Resurfacing will begin at the Intersection of MD 202 and MD 450 and extending in a Southerly direction through the 57th Avenue intersection for a total resurfacing distance 0.32 miles. Other improvements, such as drainage, bicyclist and pedestrian facilities, will begin approximately 150 feet south of the MD 450 (Annapolis Road) and 53rd Place and continue southerly to the intersection of MD 202 and MD 295 (Baltimore-Washington Parkway) northbound on/off ramps, for an overall project length of 0.71 miles. The work will consist of the following: (a) Fine mill and resurface all lanes of the existing roadway (b) Full depth pavement construction (c) Median reconstruction and widening (d) Closure on intersection to eliminate unsafe turn movements (e) Replace damaged sidewalk or curb and gutter (f) Construct ADA sidewalk ramps and entrances (g) Construction of concrete bus shelter pads to prepare sites for shelters to be installed by others (h) Cleaning of existing inlets and pipes (i) Construct new inlets, manholes, and pipe culverts (j) Replacement of existing pavement markings (k) Installation of pedestrian signals at the intersections of MD 202 with Randolph Street and the MD 295 ramp (l) Construction of retaining wall to support relocated bus stop (m)Landscaping of the widened median
Files
| File | Type | Posted |
|---|---|---|
| 839699mddotPG8575130.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity