Marc new storage tracks at martin maintenance yard
Closed State & local contract opportunity Posted
- Solicitation number
- BPM045188
- State
- Maryland
- Responses due
Opportunity facts
- Jurisdiction
- NIGP code
- UNSPSC code
Opportunity details come from emma.maryland.gov. Updated .
About this opportunity
This state and local contract opportunity is for the construction of additional train storage capacity at the Maryland Transit Administration's (MTA) MARC storage yard and maintenance facility, referred to as the Martin Maintenance Yard, located in Baltimore County, Maryland. The project involves the installation of two new layover tracks with a service aisle and potable water hydrants, a No. 8 Double Crossover between the tracks, a full-length inspection pit, compressed air piping extensions, partial electrification of the new tracks, pole-mounted light fixtures, an oily water separator, and a precast stormwater management vault. The contract requires respondents to submit their proposals through the eMMA portal no later than 2 P.M. EST on Tuesday, October 1, 2024, with an anticipated award date that is not specified.
The contract opportunity does not include any set-aside designations, and it does not mention any incumbent vendors or current contractors. The funding source and amounts are also not specified in the provided documents. The contract will be funded with federal assistance, and it includes various federal requirements such as disadvantaged business enterprise (DBE) participation, Davis-Bacon wage requirements, and other clauses mandated by the Federal Transit Administration.
Opportunity text
This Contract is for the construction for the expansion of the train storage capacity at MTA's MARC storage yard and maintenance facility in Baltimore County, adjacent to Martin State Airport and referred to as the Martin Maintenance Yard. The work involves: two new additional layover tracks with a service aisle and potable water hydrants between the tracks, a No. 8 Double Crossover between Tracks A & B, a full length, direct fixation Inspection Pit on Track I with recessed lighting and electrical receptacles, compressed air piping extensions to service vehicles at the head ends of two new layover tracks, partial electrification of the two new tracks, pole mounted light fixtures for the two new tracks, one oily water separator, a precast SWM vault with cast-in-place concrete manway access slabs and stand-by power cabinets at the block ends of the two layover tracks.
Files
| File | Type | Posted |
|---|---|---|
| T-1217-0350_-Addendum_No._1.pdf | ||
| T-1217-0350-_Addendum_No._2.pdf | ||
| T-1217-0350-_FINAL_ADVERTISEMENT.pdf | ||
| T-1217-0350- FINAL ADVERTISEMENT.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity