Main Street Boat Ramp Dredging, and Swing and Bench Shoreline Stabilization Project
Closed State & local contract opportunity
- Solicitation number
- 26-17-ITB
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 72141511 Digging services
- 72141209 Levee construction service
- 22101514 Dredgers
- 72101515 Subsidence service work
- 72141130 Ornamental fountain construction and or remodelling service
- 72141119 Aqueduct construction service
- 70171702 Dam maintenance or management services
- 95121807 Dam
- 72101512 Hoist construction service
- 72101513 Offsite construction service
- Point of contact
-
- Jessica Graham jessgraham@cityofsebastian.org (772) 388-8231
Updated .
About this opportunity
The City of Sebastian, Florida, is requesting bids on Main Street Boat Ramp Dredging and Swing and Bench Park Shoreline Stabilization under ITB 26-17, with bids due July 9, 2026, at 2:00 p.m. local time.
The scope encompasses two adjacent projects: Main Street Park dredging with erosion stabilization north of the boat ramp and rock revetment shoreline stabilization south of the boat ramp, plus Swing and Bench Park rock revetment shoreline stabilization. The awarded contractor shall provide all necessary labor, materials, equipment, transportation, and supervision to complete the specified scope of work.
A pre-bid meeting is scheduled for June 16, 2026, at 10:00 a.m. at City Council Chambers, 1225 Main Street, Sebastian, Florida 32958. Questions are due Monday, June 22, 2026, at 2:00 p.m. local time. Bids must be submitted through the City of Sebastian's Euna Procurement Portal at https://cityofsebastian.bonfirehub.com/portal/?tab=openOpportunities. The solicitation documents are available through the same portal.
Opportunity text
The work required under this solicitation includes Main Street Park Dredging, Shoreline and Erosion Stabilization. The City of Sebastian intends to select one contractor to complete two projects that are adjacent to each other: (1) Main Street Boat Ramp Dredging, including Erosion Stabilization north of the boat ramp, and Shoreline Stabilization rock revetment south of the boat ramp; and (2) Swing and Bench Park Shoreline Stabilization rock revetment. The awarded contractor shall provide all necessary labor, materials, equipment, transportation, and supervision to complete the scope of work as specified in the solicitation package.
Files