Luzerne County Resurfacing 2026
Closed State & local contract opportunity Posted
- Solicitation number
- 124177
- State
- Pennsylvania
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Pennsylvania Department of Transportation is soliciting bids on the resurfacing of approximately 4.87 miles of existing roadway across various routes in Luzerne County under Project 124177, with bids due August 13, 2026 at 11:00 AM. Prequalification is required; no pre-bid meeting is specified. The project is 100% state-funded and carries prevailing wage requirements, Diverse Business (DB) participation requirements, Buy America provisions, and prohibition on unmanned aircraft systems from covered foreign entities.
The scope includes asphalt wearing course (6,411 tons, SRL-H) and scratch course (2,580 tons) placement; milling at 2-inch depth (89,331 square yards); tack coat (182,036 square yards); line painting; base repair; shoulder backup; guide rail removal (5,075 linear feet) and replacement; and drainage work on SR 2019. All work occurs within existing roadway limits. Maintenance and protection of traffic consists of short-term traffic control patterns compliant with MUTCD guidelines and PennDOT specifications. Construction must begin by September 28, 2026 and complete by November 26, 2027.
The estimated contract value falls in the $1 million to $2.5 million range. Final payment requires certified payroll records, DBE/DB payment documentation, material certifications, as-built drawings, post-construction stormwater management documentation, and asphalt pavement ride quality evaluation with incentive and disincentive provisions. Bid opening occurs at the Commonwealth Keystone Building, 400 North Street, Harrisburg, Pennsylvania. All addenda post electronically through ECMS.
Opportunity text
This project is for the resurfacing of approximately 4.87 miles of existing roadway on various routes in Luzerne County, Various Municipalities in the Commonwealth of Pennsylvania. This is a resurfacing project that includes an asphalt wearing course, scratch course, milling, line painting, base repair, shoulder backup, and guide rail replacement. Drainage work is also to be done on SR 2019. All work will be completed within the existing roadway. All maintenance and protection of traffic (MPT) will be completed in accordance with the special provisions of the contract, Federal Highway Administration Manual on Uniform Traffic Control Devices (MUTCD), Pub 213 (Work zone Traffic Control Guidelines), Pub 212 (Official Traffic Control Devices), Pub 35 (Qualified Products List for Construction, Bulletin 15), Pub 408, Pub 236 (Handbook of Approved Signs), and Pub 46 (Traffic Engineering Manual). All MPT will consist of short-term patterns.
Files
| File | Type | Posted |
|---|---|---|
| 834766padot124177.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity