Lincoln Sewer Program - Construction, Engineering & Inspection (CE&I)
Open State & local contract opportunity Posted
- Solicitation number
- 324744
- State
- Idaho
- Responses due
Opportunity facts
- Jurisdiction
- Points of contact
-
- Hallie Hart hhart@cityofcaldwell.org
- TJ Frans tjfrans@cityofcaldwell.org
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Caldwell, Idaho is soliciting bids for Construction, Engineering & Inspection (CE&I) services on the Lincoln Sewer Program, with bids due December 14, 2026. The notice, posted November 24, 2026, covers three sanitary sewer infrastructure packages located in Caldwell, within Canyon County.
Package 1 is construction of a site-built, cast-in-place concrete and masonry lift station. Its scope includes dewatering, shoring, mechanical pumps, internal and site piping, HDPE fusion welding, a standby generator, odor control, and electrical and SCADA integration tied into the City's Wastewater Treatment Plant. CE&I services for this package cover controls and SCADA verification and coordinated system startup. Package 2 is installation of approximately 11,200 linear feet of 24-inch to 36-inch PVC gravity sewer main, generally buried 15 to 25 feet deep. Package 3 is two phases of sanitary sewer force main, roughly 10,030 to 10,500 linear feet depending on routing exhibits, with trenchless and major crossings under Interstate 84 and Mason Creek.
Opportunity text
The three (3) major sanitary sewer infrastructure packages in Caldwell, Idaho include the following: Package 1 Lincoln Lift Station: Construction of a site-built cast-in-place concrete and masonry lift station, including dewatering, shoring, mechanical pumps, internal/site piping, HDPE fusion welding, standby generator, odor control, and electrical/SCADA integration tied into the Citys Wastewater Treatment Plant. CE & I services cover controls/SCADA verification and coordinated system startup. Package 2 Gravity Sewer Line: Installation of approximately 11,200 linear feet of 24-inch to 36-inch PVC gravity sewer main, generally buried at depths of 15 to 25 feet. Package 3 Force Mains: Construction of two phases of sanitary sewer force mains (roughly 10,030 to 10,500 linear feet depending on routing exhibits), featuring trenchless/major crossings under Interstate 84 (I-84) and Mason Creek.
Files
| File | Type | Posted |
|---|---|---|
| Bid Notice-Lincoln Sewer Program - Construction_ Engineering _ Inspection (CE_I).pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity