Gaston County, North Carolina is soliciting bids for mechanical, electrical, and plumbing work to replace the steam-powered heating system in the Lena Sue Beam building with a hot water heating system, with proposals due August 12, 2026.

The scope includes providing and installing two condensing boilers, two primary pumps for boiler water circulation, a new air and dirt separator, and two ion-generating air purifiers in air handlers. The contractor must perform daily cleanup of work areas, paths of entry, and material delivery and removal. All installations must meet applicable standards; the contractor bears full responsibility for correcting any deficiencies that prevent receiving a green tag from building inspectors and for repairing or replacing any damage to buildings, walkways, and foliage incurred during the project at their own expense. Air testing must comply with OSHA standards. The awardee must provide comprehensive training to facilities maintenance personnel on all newly installed equipment, including a maintenance-schedule walk-through.

No contract value, contract term, place of performance details, incumbent, evaluation criteria, pre-bid meeting, or question deadline are specified in the available source material.

Opportunity text

Provide and install mechanical, electrical and plumbing equipment in the Lena Sue Beam building to remove the steam powered heating system and provide a hot water heating system. Air purifiers are to be installed on the air handlers. 1. Provide and install (2) two condensing boilers. 2. Provide and install (2) primary pumps to circulate boiler water. 3. Provide and install a new air and dirt separator. 4. Provide and install (2) Ion generating air purifiers in two (2) air handlers. 5. Daily cleanup of all work areas, paths of entry and material delivery and removal. 6. Any damage to buildings, walkways, and foliage will be the responsibility of the contractor to repair or replace at their expense. 7. Any deficiencies found in the installation of materials used in the installation that would prevent receiving a green tag from inspectors will be the contractors responsibility and expense to correct. Air tests will be performed to meet the OSHA standards. 8. The owner is to receive training on all new equipment for facilities maintenance, training to include a schedule walk-through for maintenance personnel

Files

File Type Posted
Lena Sue Beam Boiler Addition Project.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity