Ladd Road Bridge over Sunny Brook and Tenney Road Bridge over Sunny Brook Town of Roxbury, VT

Closed State & local contract opportunity Posted

Solicitation number
64145
State
Vermont
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from vermontbusinessregistry.com. Updated .

About this opportunity

The Vermont Department of Transportation is seeking qualified contractors for a critical infrastructure replacement project in Washington County, specifically targeting two bridge structures in the Town of Roxbury that were damaged during a flood event in July 2023. The procurement involves replacing the Ladd Road Bridge and Tenney Road Bridge, both currently consisting of steel beam bridges with timber decks on laid stone abutments. The replacement structures will be steel plate culverts, each with a 33' span and 7'-6" rise, supported by piled foundations. Key project deliverables include complete bridge replacement, comprehensive bank stabilization to protect new culverts and wingwalls from potential scour, and restoration of critical transportation infrastructure. The contract opportunity was posted on February 17, 2025, with proposals due by March 7, 2025, giving potential bidders approximately three weeks to prepare and submit comprehensive response packages.

While specific set-aside designations are not explicitly detailed in the procurement documentation, the project appears to be a standard infrastructure replacement initiative open to qualified engineering and construction firms with demonstrated experience in bridge replacement and water infrastructure projects. The total project budget is not specified, but the complexity of the work suggests a substantial investment in infrastructure restoration. The two bridge replacement projects represent significant engineering challenges, requiring advanced technical capabilities in culvert installation, foundation engineering, and bank stabilization techniques. Contractors will need to demonstrate expertise in flood-damaged infrastructure reconstruction, specialized foundation work, and the ability to execute precise engineering solutions in challenging rural terrain. Prospective bidders should be prepared to provide detailed technical proposals, engineering credentials, and proof of capability to successfully complete these critical transportation infrastructure improvements in Washington County, Vermont.

Opportunity text

The Ladd Road Bridge project consists of the replacement of a former steel beam bridge with timber deck on laid stone abutments. The existing structure was washed out during a flood event in July 2023 and replaced off-alignment upstream with a temporary structure made of steel beams, timber deck, and concrete block abutments. The replacement structure will be a steel plate culvert that has a 33' span and 7'-6" rise on a piled supported foundation. Bank stabilization will be included as needed to protect the newly installed culvert and wingwalls from scour. The Tenney Road Bridge project consists of the replacement of an existing steel beam bridge with timber deck on laid stone abutments. The existing structure was damaged during a flood event in July 2023 and had short-term abutment repairs to maintain the bridge until it's replacement. The replacement structure will be a steel plate culvert that has a 33' span and 7'-6" rise on a piled supported foundation. Bank stabilization will be included as needed to protect the newly installed culvert and wingwalls from scour.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors