La Quinta Retention Basin Upgrades

Closed State & local contract opportunity Posted

Solicitation number
RFB-26-340, 0427-STORM2
State
Arizona
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Yuma, Arizona is requesting bids on La Quinta Retention Basin Upgrades (RFB-26-340) under Design-Bid-Build, with bids due September 3, 2026 at 11:00 a.m. Arizona Time and a pre-bid conference on August 18, 2026 at 9:00 a.m. at 2959 South Broken Arrow Lane, Yuma.

The scope includes grading modifications to the existing retention basin at 29th Lane Linear Park; installation of new catch basins and an 18-inch storm drain system; and construction of a new stormwater lift station that will pump standing water from the retention basin to an adjacent field to improve water dissipation through increased percolation and surface infiltration. Substantial Completion is required within 120 calendar days after Notice to Proceed, with Final Completion within 30 calendar days thereafter.

Award will be made to the lowest responsive and responsible bidder. Bid security equal to at least 10 percent of the bid amount is required in the form of a certified check, cashier's check, or surety bond. The successful contractor must furnish performance and payment bonds each equal to 100 percent of the contract sum, with bonding companies rated B++ or better by A.M. Best Company.

Insurance requirements include Commercial General Liability of $1,000,000 per occurrence with $2,000,000 aggregate, Business Automobile Liability of $1,000,000, and Umbrella/Excess Liability of $4,000,000. The contractor must comply with Arizona Revised Statutes requirements, including tax liability bonds and contractor licensing laws. Questions are due August 25, 2026 at 11:00 a.m. Arizona Time. Bids must remain valid for 90 days following bid opening. All addenda will be posted through the Procurement Portal at least seven days prior to the bid deadline. The successful bidder must execute the contract within ten days of receiving the Notice of Award.

Opportunity text

Grading modifications to the existing retention basin including new catch basins and a new 18" storm drain system to connect to the new storm water lift station. The new storm water lift station will pump standing water from the existing retention basin at 29th Lane Linear Park to the existing large field on the adjacent property to the east, in order to improve the dissipation rate of the water via increased percolation rate and surface area for infiltration and evaporation in order to minimize and/or prevent standing water related nuisances.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity