Louisiana Department of Transportation and Development (LA DOTD) is soliciting electronic bids for asphalt roadway patching on LA 58 between LA 56 and LA 55 under State Project No. 4400036356, with bids due December 10, 2026 at 10:00 a.m. Eligibility is restricted to contractors licensed under LA R.S. 37:2150-2192 for Highway, Street, and Bridge Construction, and bidders must complete online registration at wwwsp.dotd.la.gov before submitting. Bids are accepted only through www.bidx.com, with no paper bids accepted. The project proposal places the work in Terrebonne Parish, while the listing's jurisdiction field names Washington Parish.

The scope covers 1.614 miles of roadway patching from Control Section 247-30 log mile 0.007 to log mile 1.608. Contractors must maintain at least one lane open to traffic at all times, and no work is allowed during major holidays or hurricane evacuation procedures. Insurance requirements include commercial general liability at the combined single limits in Table 107.2-1, an Owner's and Contractor's Protective Liability policy naming LA DOTD as named insured, workers compensation, and business automobile liability, all carried by insurers rated A-:VI or higher by A.M. Best. Contractors must perform at least 50 percent of the work with their own organization, and any subletting requires written consent.

The estimated cost range is $250,000 to $500,000, stated for informational purposes only, with final bid evaluations based on the actual estimate value published at bid opening. The contract requires completion within 30 working days after Notice to Proceed, plus a 30-calendar-day assembly period before time charges begin. Payment adjustments apply to Performance Graded asphalt cements, gasoline, diesel fuel, and steel when costs vary more than 15 percent from established base prices.

Questions must be submitted through the Falcon system at wwwsp.dotd.la.gov. Submissions made within 96 hours of bid opening may go unanswered before bidding. The Assistant District Administrator of Construction is Corbett Hollier, P.E., and the Project Engineer is Matthew Burgess, P.E.

Opportunity text

Roadway Patching limits: The project begins at C.S 247-30 log mile 0.007 and ends at C.S. 247-30 log mile 1.608.

Files

File Type Posted
4400036356_proposal.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors