Koeblen Road Segment 2 - SH 36 at Band Road to 2, 850ft West of FM 2218
Closed State & local contract opportunity
- Solicitation number
- 2027-01B
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Blake Skiles tskiles@rosenbergtx.gov (832) 595-3363
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
The City of Rosenberg, Texas is requesting sealed bids for construction of Koeblen Road Segment 2, a 2.85-mile roadway segment extending from State Highway 36 at Band Road to 2,850 feet west of FM 2218 in Fort Bend County, with bids due October 15, 2026 at 2:00 p.m. and a mandatory pre-bid meeting on September 30, 2026 at 11:00 a.m. via Microsoft Teams. The City may grant local bidder preference if bids are within 5% of the lowest bid.
The scope encompasses comprehensive roadway construction: earthwork; hot-mix asphalt concrete surfaces and base layers; concrete pavement with joint reinforcement; concrete curbs, gutters, and sidewalks; drainage infrastructure including reinforced concrete pipes and inlets; two bridge structures (eastbound and westbound) across Seabourne Creek with drilled straight shaft or driven steel pipe pile foundations; traffic signal systems; waterline installation; signing; and pavement markings. The geotechnical report specifies foundation design parameters, including 24-inch diameter drilled shafts or alternative driven piles with minimum tip elevations 40 to 54 feet below grade, and rigid pavement sections of 7 inches reinforced concrete over 8 inches chemically treated subgrade designed for 450,000 equivalent 18-kip single axle loads over 20 years. The bid includes 126 line items across removal, roadway, drainage, bridge, signaling, and waterline categories.
The estimated budget is $9.1 million with a 360 calendar day completion timeline. Bidders must submit a 5% bid bond, and the successful contractor must furnish performance and payment bonds each equal to 100% of contract price from sureties with Treasury Department certificates of authority and "A" ratings. Liquidated damages range from $570 to $2,590 per calendar day on a sliding scale. Retainage up to 10% applies until final acceptance. Prevailing wage rates under Texas Government Code Chapter 2258 apply. Questions are due October 9, 2026 at 5:00 p.m. Contractor selection is anticipated for November 3, 2026. All bids must remain firm for 60 days following opening.
Opportunity text
CONSTRUCTION DOCUMENTS AND TECHNICAL SPECIFICATIONS
For Construction of
Koeblen Road Segment 2 - SH 36 at Band Road to 2,850ft West of FM 2218
for
THE CITY OF ROSENBERG
Rosenberg Bid Number 2027-01B
TXE-2027-01
FORT BEND COUNTY, TEXAS
CivilCorp, LLC
Engineering Job No. 2400501
29255 FM 1093, Suite 7A
Fulshear, TX 77441
(832) 252-8100
Estimated Budget: $9,100,000
Estimated Completion Days: 360 Calendar Days