King County International Airport Pavement Improvements Work Order 2026
Closed State & local contract opportunity Posted
- Solicitation number
- KC001683
- State
- Washington
- Responses due
Opportunity facts
- Jurisdictions
- Points of contact
-
- Kelly McKeever kelly.mckeever@kingcounty.gov (206) 263-9381
- Annette Hansford ahansford@kingcounty.gov (206) 263-9381
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
King County, Washington is requesting bids on pavement and drainage maintenance improvements at King County International Airport under ITB KC001683, with bids due July 28, 2026. The contract carries a 7% minimum set-aside for King County Certified Small Contractors and Suppliers (SCS) applied to the total price of all executed work orders, and a 15% minimum apprentice utilization requirement based on total labor hours worked.
The scope consists of multiple work orders issued throughout the contract term for clearing, excavation, removal and disposal of existing site materials, placement of finished surfaces and curbing for unreinforced and reinforced concrete slabs, paving with Portland Cement Concrete and/or asphalt concrete, pipe installation, pavement paint marking installation and removal, emergency pavement repairs, and miscellaneous site improvements. Subcontracting opportunities are available for grinding, sweeping, marking, and surveying.
No specific contract value, contract term length, or proposal deadline for questions is stated in the source materials.
Opportunity text
B.A. The Contract consists of Work Orders to be issued by the Airport within the Contract Time for paving and drainage maintenance improvements at the Airport. Work includes, but is not limited to, clearing, excavation, removal, and disposal of existing site materials; placing finished and curbing of unreinforced and reinforced slabs; paving with Portland Cement Concrete and/or asphalt concrete; installations of pipe sections, installation and removal of pavement paint markings, emergency pavement repairs and other miscellaneous site improvements. Subcontracting Opportunities: Grinding, Sweeping, Marking, and Surveying. 7% minimum requirement for King County Certified Small Contractors and Suppliers (SCS) for the total price of all executed Work Orders. 15% minimum Apprentice Utilization Requirement of the total labor hours worked during the contract.
Files
| File | Type | Posted |
|---|---|---|
| KC001683-itb-vol-1.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity