The state of Georgia, specifically Early County, is seeking sealed bids for the Kennedy Bridge Drainage Improvements project (PE24271), with proposals due on June 11th, 2025 at 2:00 PM at the Evans County Commissioners Office. The procurement involves comprehensive drainage and road infrastructure improvements, including construction of upstream and downstream concrete aprons, structural repairs to the northwest corner of the culvert, removal and regrading of existing material, installation of rip-rap for erosion control, and full-depth replacement of the southbound lane and shoulder of Kennedy Bridge Road. Contractors must provide proof of a valid Georgia Utility Contractor license and employ a Utility Manager certification holder to oversee the work. The project requires excavation to a depth of 3 feet in two designated areas behind the headwall and wingwalls, with a total project completion timeline of 90 calendar days. Bid documents can be obtained from Parker Engineering, LLC for a non-refundable fee of $150.00 per full-size set, and all bids must be accompanied by a bid bond or certified cashier's check for no less than 10% of the base bid.

The solicitation does not explicitly mention specific set-aside designations or restrictions for disadvantaged enterprises. Bidders must meet specific licensing requirements, including holding a valid Utility Contractor license from the State of Georgia and having a Utility Manager certification holder on staff. While no incumbent vendors are identified, the project involves significant infrastructure improvements to an existing bridge and roadway. Potential contractors should be prepared to integrate their work with existing infrastructure and demonstrate technical expertise in drainage improvements, road reconstruction, and erosion control. Although a specific budget range is not provided, the complexity of the project—involving concrete work, road replacement, and drainage modifications—suggests a substantial capital investment. Interested parties are advised to carefully review the complete contract documents and ensure compliance with all technical specifications and licensing requirements before submitting a bid.

Opportunity text

Sealed bids for construction of Kennedy Bridge Drainage Improvements will be received until June 11th, 2025 at 2:00 PM at the Evans County Commissioners Office at which time and place they will be publicly opened and read. Any bid received after said time and date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days. The work shall consist of furnishing all products and equipment and performing all labor necessary to perform the following: This project involves the construction of upstream and downstream concrete aprons, including securely tying into the existing wingwalls. It also includes structural repairs to the northwest corner where the culvert meets the wingwall. Additional work includes the removal and regrading of existing material behind the upstream wingwalls, installation of rip-rap on both sides of the culvert for erosion control, and the full-depth, full-width removal and replacement of the southbound lane and shoulder of Kennedy Bridge Road. This includes excavation to a depth of 3 feet in two designated areas behind the headwall & wingwalls. Time allotted for final completion of work is 90 calendar days. Contract Documents are on file at Parker Engineering, LLC. Copies may be obtained from Parker Engineering, LLC., 36 Courtland Street, Suite B, Statesboro, Georgia 30458, Phone: (912) 764-7722, Email: lindsey@parker-engineering.com, upon payment of $150.00 for each full-size set (non-refundable). The Scope of Work as described herein is defined as ¿utility contracting¿ in accordance with O.C.G.A 43-14-2(17) so the Contractor performing the work must provide proof of a valid license by the State of Georgia as a ¿Utility Contractor¿ and must also employ a ¿Utility Manager¿ certification holder who will have oversight of all the work. Bids shall be accompanied by a bid bond or certified cashier¿s check in an amount not less than 10% of the base bid.

Files

File Type Posted
00100_Advertisement to Bid_Kennedy Bridge.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors