James e quarles water treatment plant taste & odor

Awarded State & local contract opportunity Posted

Solicitation number
MDJ-7310
State
Georgia
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

The Cobb County-Marietta Water Authority is requesting sealed bids for taste and odor process improvements at the James E. Quarles Water Treatment Plant, with bids due August 31, 2021 and a mandatory pre-bid conference on August 9, 2021. Only bids including pre-qualified Instrumentation and Control System Integrators and approved electrical subcontractors will be considered — MR Systems, Inc. is the sole pre-qualified I&C integrator, and approved electrical subcontractors are Cleveland Electric Company, Crowder Construction Company, and Excel Electrical Technologies, Inc.

The scope encompasses installation of a 13-foot diameter PAC storage silo with 3,250 cubic feet capacity, a PAC slurry tank, three PAC slurry feed pumps with adjustable frequency drives, a CMU block and brick facade equipment and electrical building (approximately 400 square feet), ancillary instrumentation, PAC feed lines and injection assemblies to active raw water force mains, potable water backflow preventers for the entire site, replacement of the existing potable water meter vault with an H-20 traffic-rated vault, rerouting of existing storm water drainage pipes and utilities, system start-up and commissioning, SCADA system integration, and site civil improvements including landscaping and fence replacement. The work will be awarded in one contract.

Bidders must be Georgia-licensed utility and general contractors with supervisory personnel trained in Level 1A Georgia Erosion and Sediment Control. Each bid must include a 5% bid bond, notarized non-collusion affidavit, contractor's license certification, and security and immigration compliance certification. The successful bidder must furnish performance and payment bonds and comply with Georgia pre-construction oath and subcontractor affidavit requirements. Substantial completion is due within 360 consecutive calendar days and final completion within 390 consecutive calendar days from commencement. Contract documents were available for a non-refundable $20 fee.

Opportunity text

The Project includes, but is not limited to, the following major elements: 1.The installation of a 13-foot diameter PAC storage silo with 3,250 cubic feet storage capacity and associated appurtenances. 2.PAC slurry tank and associated appurtenances located within the silo skirt area. 3.Three PAC slurry feed pumps with adjustable frequency drives. 4.A CMU block and brick façade equipment and electrical building with standing seam metal roof of approximately 400 square feet. 5.Ancillary equipment and instrumentation for the PAC Treatment System. 6.PAC feed lines and injection assemblies to the active raw water force mains. 7.The installation of potable water backflow preventers for the entire Raw Water Pump Station site and replacement of existing potable water meter vault with H-20 traffic rated vault and cover. 8.Rerouting of existing storm water drainage pipes and other utilities. 9.System start-up and commissioning. 10.Integration of the PAC treatment system into the CCMWA SCADA system. 11.Landscaping, fence replacement and other site civil improvements. Please see attachment for more information

Files

File Type Posted
Award Information —
Quarles Taste and Odor Improve —

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity