The Board of Education of St. Mary's County, Maryland, on behalf of St. Mary's County Public Schools (SMCPS), is requesting sealed bids from experienced and qualified contractors to perform the removal of existing drop tube flapper valve overfill devices and the installation of new pressure delivery overfill devices and drop tubes for multiple underground fuel storage tanks throughout SMCPS schools and administrative buildings. The work includes using the existing risers and spill basins where possible, installing new risers for stick points, providing Veeder Root technician services to correct programming issues and train site staff, performing any necessary site work, and conducting cleanup after the installations. Bids are due on June 9, 2023, at 1:00 PM local time, and the contract period is from June 2023 through July 2023. Site visits must be coordinated with SMCPS prior to the bid opening. The contract will be awarded to the lowest responsive and responsible bidder meeting all terms and conditions.
There are no specific Minority Business Enterprise (MBE) requirements, but MBE participation is encouraged. The ITB does not list any incumbent vendors or current contractors, and it does not provide any information on existing infrastructure or technology that requires integration. The ITB does not specify a budget range or possible award values for this project.
Opportunity text
The Board of Education of St. Mary's County on behalf of St. Mary's County Public Schools (SMCPS) is requesting sealed bids from experienced and qualified Contractors to perform removal of the drop tube flapper valve overfill device and install a new pressure delivery overfill device and drop tube for multiple underground fuel storage tanks throughout SMCPS schools and administrative buildings. The existing riser and spill basin should be used where possible. Install a new riser to be used as a stick point (measuring point). Provide a Veeder Root technician to correct programming issues and to provide training to site staff at sites with the Veeder Root system. Perform any site work that is required as well as clean-up after installations. Provide overfill verification form for MDE upon completion of installation.
Files
| File | Type | Posted |
|---|---|---|
| ITB - Underground Fuel Storage Tank Remediation.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity