ITB No. 25-006 Exit 29 Water Production Facility & Elevated Storage Tank: DIVISION II RE-BID

Closed State & local contract opportunity Posted

Solicitation number
PE-66315-NONST-2025-000000012
State
Georgia
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 24
Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

The Brunswick-Glynn County Joint Water and Sewer Commission (BGJWSC) is soliciting sealed bids for ITB 25-006, specifically Division II of the Exit 29 Water Production Facility & Elevated Storage Tank project located in Brunswick, Georgia. The procurement involves constructing a 500,000-gallon elevated water storage tank with associated site improvements, including approximately 1,100 linear feet of 12-inch distribution piping, site piping, fence work, grading, and clearing. Key project deliverables encompass comprehensive site preparation, tank design, painting, electrical work, SCADA systems, concrete installations, and all necessary appurtenances to complete the infrastructure development. Bidders must demonstrate significant experience, including completion of at least five similar elevated tank projects of 500,000 gallons or greater, ownership of fabrication facilities, and maintaining a qualified on-site supervisor with a Georgia Utility Contractor License. The bid solicitation requires a 5% bid bond, with bids due on March 6, 2025, at 12:00 NOON EST, and an optional pre-bid teleconference and site visit scheduled for February 19, 2025, with questions due by February 21, 2025. The project timeline mandates substantial completion within 540 calendar days and final completion within 600 calendar days.

The contract is funded through the SPLOST 2022 referendum approved by Glynn County voters, with an anticipated award date of March 20, 2025. While no specific set-aside designations for disadvantaged enterprises are explicitly mentioned, the procurement requires substantial contractor qualifications, including maintaining specific insurance coverage of $2 million in general aggregate liability, $2 million each occurrence liability, and $2 million in umbrella coverage. The selected contractor will be responsible for all policy deductible costs and must furnish 100% performance and payment bonds. The project is part of a larger water infrastructure development, with Divisions I and III related to well improvements and water production facility work already awarded on January 16, 2025. No coordination between the divisions is anticipated, suggesting this is a segmented infrastructure improvement initiative. Although the exact contract value is not specified, the comprehensive scope of work and extensive infrastructure requirements suggest a significant capital investment in water production and distribution infrastructure for the Brunswick-Glynn County area.

Opportunity text

Sealed bids for ITB 25-006 EXIT 29 WATER PRODUCTION FACILITY & ELEVATED STORAGE TANK: DIVISION II REBID - Thomas & Hutton No. J-30998.0000 - BGJWSC No. 2216S will be received by the Brunswick-Glynn County Joint Water and Sewer Commission at the JWSC¿s Office of the Procurement Director, 1703 Gloucester Street, Brunswick, Georgia 31520 until 12:00 NOON EST, Thursday, March 6, 2025, at which time and place they will be publicly opened and read aloud. No submitted bid may be withdrawn after the scheduled closing time for receipt of bids for a period of sixty (60) days. This project is funded by proceeds from the SPLOST 2022 referendum approved by Glynn County voters during the General Election on November 8, 2022. The project location is 501 South Port Parkway, Brunswick, Glynn County, GA, 31523. Divisions I and III, associated with well improvements, water production facility, and miscellaneous piping were awarded on January 16th, 2025, by Brunswick-Glynn County Joint Water and Sewer Commission. No coordination between Divisions I, II, and III is anticipated. The Work for this division includes the construction of a 500,000-gallon elevated water storage tank, site piping, fence work, approximately 1,100 LF of 12¿ distribution piping, grading, and clearing, all as shown and specified. The work includes site preparation, clearing and grubbing, access routes, piping, tank design, painting, all electrical, SCADA, concrete, and other accessories as shown on the plans. Work shall include all labor, equipment, materials, appurtenances, and incidentals required to complete this project.

Files

File Type Posted
2025_01_23 _ 30998_0000 _ Div II Rebid Vol 1 .pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors