ITB - Extension of Birnam Wood Boulevard from Hickorygate Drive to south of Harris County Flood Control District (HCFCD) Unit # J109-01-01 for Harris County Precinct 3
Closed State & local contract opportunity Posted
- Solicitation number
- 26/0251
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
Opportunity details come from harriscountytx.bonfirehub.com. Updated .
About this opportunity
Harris County Precinct 3 is requesting bids for the extension of Birnam Wood Boulevard from Hickorygate Drive to south of Harris County Flood Control District Unit J109-01-01, with bids due August 24, 2026 (ITB, UPIN #20104MF1BG01).
The scope encompasses design and construction of the boulevard extension within the specified limits. No estimated contract value, contract term, evaluation criteria, pre-bid or site-visit dates, incumbent contractor, or technical specifications are provided in the source.
Opportunity text
Extension of Birnam Wood Boulevard from Hickorygate Drive to south of Harris County Flood Control District (HCFCD) Unit # J109-01-01 for Harris County Precinct 3 - UPIN #20104MF1BG01
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity