ITB 2027-020 City Hall Fire Escape Lead Paint Removal and Painting

Open State & local contract opportunity Posted

Solicitation number
IFB-130027
State
Virginia
Responses due

Opportunity facts

Jurisdictions
Point of contact

Opportunity details come from mvendor.cgieva.com. Updated .

About this opportunity

The City of Salem, Virginia is soliciting bids through ITB 2027-020 for lead-based paint removal, priming, and repainting of exterior steel fire escapes, doors, and trim at Salem City Hall, 114 N. Broad Street, with bids due November 19, 2026. The posting lists Salem City and Roanoke County as jurisdictions.

The contractor must remove existing lead-based paint and prepare metal surfaces to bare metal and wood surfaces to a sound substrate on the north and south fire escapes. Each surface then receives one coat of primer and two finish coats of exterior paint. The contractor provides all supervision, labor, materials, equipment, access equipment, containment, testing, transportation, and waste disposal, and must comply with applicable local, state, and federal lead-based paint requirements. Repairs to the broken steps and platform on the north fire escape are performed by others after paint removal in those areas, so the contractor must sequence its work and remobilize as the Scope of Work describes.

Opportunity text

The work shall include, but shall not be limited to, the safe removal of existing lead-based paint from, and the priming and repainting of, the exterior steel fire escapes and associated doors and trim on the north and south sides of Salem City Hall, 114 N. Broad Street, Salem, VA 24153. Metal surfaces shall be prepared to bare metal and wood surfaces to a sound surface, followed by one (1) coat of primer and two (2) finish coats of exterior paint. The Contractor shall provide all supervision, labor, materials, equipment, access equipment, containment, testing, transportation, and waste disposal necessary to perform the work in compliance with all applicable local, state, and federal lead-based paint requirements. Repairs to the broken steps and platform on the north side fire escape will be performed by others after paint removal in those areas, and the Contractor shall sequence its work and remobilize as described in the Scope of Work.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors