IS4 – Phase 2 (Construction of Storm Sewer Lift Station)
Open State & local contract opportunity Posted
- Solicitation number
- 594 31 63 01
- State
- Washington
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Alan Lytton alan.lytton@ci.stanwood.wa.us
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
A construction solicitation for IS4 Phase 2, a storm sewer lift station in the City of Stanwood, Washington, has bids due November 17, 2026. The opportunity was posted October 20, 2026, and the source lists Snohomish County (FIPS 53061) and Tacoma City (FIPS 5305370000) as jurisdictions.
The scope is a concrete cast-in-place underground vault approximately 24 feet deep, housing three 185 hp submersible Flygt pumps at the northeast corner of 92nd Avenue and State Route 532. Discharge runs through a 24-inch restrained joint ductile iron force main that transitions to 24-inch fusion-welded HDPE south of SR 532 and connects to the existing outfall. The force main is sleeved through an existing 36-inch corrugated metal drainage pipe under SR 532, avoiding an open cut across the state highway. The work also includes storm conveyance piping with catch basins and a jellyfish filter treatment system with a flow splitter that bypasses larger flows. Electrical scope covers VFD starter panels, supply panels, a disconnect for a portable city-owned generator, and supply power vaults. A 72-inch corrugated metal storm pipe 14 feet beneath the east sidewalk on 92nd Avenue must be partially removed to allow vault construction.
Site conditions drive method. Groundwater sits at 5 feet, so dewatering and shoring are required, and trench layback is not an option because of tight site constraints. Coordination with Snohomish County PUD (SnoPUD) is required because several power poles will be relocated. The signed construction manual, a 73 MB file posted October 20, 2026, sets out construction execution and quality control requirements for the project.
Opportunity text
The IS4 Phase 2 project involves construction of a storm sewer lift station consisting of a concrete cast in place underground vault with three 185 hp submersible Flygt pumps at the NE corner of 92nd Ave/SR 532 intersection in the City of Stanwood. Discharge from the pumps will be through a 24-inch diameter restrained joint DI force main that will couple with a fusion welded 24-inch diameter HDPE pipe just south of SR 532 and connecting to the existing outfall. The 24-inch discharge force main will be sleeved through the existing 36-inch cmp drainage discharge pipe under SR 532, so an open cut across the state highway to install the discharge force main will not be needed. Included in the station will be all electrical equipment including an electrical component FRP enclosure. Electrical equipment shall include but not be limited to VFD starter panels, supply panels, a disconnect for a portable city owned generator and setting of supply power vaults for power serviced. Storm conveyance piping into the pump vault will be large diameter SD pipe with catch basins and a jellyfish filter treatment system. The treatment system will have a flow splitter upstream of treatment to allow for larger flows to bypass the filter. There is a large (72-inch) Corrugated metal storm pipe 14-feet under the sidewalk along the east side of 92nd that will need to be partially removed to allow for the vault to be constructed. With the vault being approximately 24-feet deep and groundwater at 5-feet, dewatering and shoring will be needed. Layback of the trench sides is not an option due to tight site constraints. Coordination with SnoPUD will be required as a few of the power poles are to be relocated.
Files
| File | Type | Posted |
|---|---|---|
| 260076 Stanwood_IS4_Ph2_Manual - SIGNED FULL (R).pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity