Invitation to Bid #26029-B FCWS ¿ Alum System Upgrades
Closed State & local contract opportunity Posted
- Solicitation number
- PE-65600-NONST-2026-000000187
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 73078 Signal Averagers, Integrators, Etc.
- 83004 Aluminum Tanks, All Kinds
- 83033 Filters, Storage Tank
- 85544 Lighting And Dimming Controls: Autotransformer Dimmers, Control Panels, Solid State Thyristor/Triac Dimmers, Etc.
- 88544 Corrosion, Scale, And Sludge Control Chemicals: Alum, Amines (Morpholine, Etc.), Sodium Sulfite, Etc.
- UNSPSC codes
- 12164200 Retarders
- 12163602 Gas production corrosion inhibitors
- 12163802 Oxygen scavengers
- 47101606 Corrosion control chemicals
- 12163800 Chemical scavengers
- 12163101 Anti sludge additives
- 12163805 Production oil treatment chemicals
- 47101616 Sludge reducing agent
- 12163700 Gas hydrate controllers
- 12162503 Flotation aids
Show all 28
- 12163601 Oil production corrosion inhibitors
- 12163701 Kinetic hydrate controllers
- 12163801 Hydrogen sulfide scavengers
- 12163803 H2S absorbent
- 39112400 Stage and studio lighting dimming and control devices
- 39112401 Dimmers and accessories
- 39112402 Lighting control consoles and accessories
- 39112403 Lighting power supply and control units
- 12163100 Anti sludgers
- 12163600 Corrosion inhibitors
- 12163001 Mud cleanout agents
- 12163102 Deflocculant
- 12163804 Mercury absorbent
- 12163901 Scale inhibitor
- 12163902 Scale removers or converters
- 12164201 Acid corrosion inhibitors
- 47101506 Corrosion control equipment
- 47101603 Descalers
- Point of contact
-
- Colette Cobb ccobb@fayettecountyga.gov (770) 305-5115
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
Fayette County Water System (FCWS) issued Invitation to Bid #26029-B for construction of alum system upgrades at two water treatment facilities: the Crosstown and South Fayette Water Treatment Plants. This lump sum construction procurement requires contractors to perform comprehensive modifications to the chemical feed systems at both locations, including demolition of existing level monitoring equipment and lime fill station control panels, installation of new ultrasonic level sensors, control panels with Allen-Bradley programmable logic controllers and operator interface terminals, electrical modifications, instrumentation integration with FCWS SCADA systems, and painting of existing equipment. Bidders were required to attend a mandatory pre-bid conference to qualify for submission, with bids due by 3:00 p.m. on Tuesday, November 25, 2025. The successful contractor must achieve substantial completion within 335 calendar days and final completion within 365 calendar days from the Notice to Proceed, subject to liquidated damages of $250 per day for delays. The contract requires a bid bond equal to five percent of the total bid amount, with performance and payment bonds each equal to 100 percent of the contract value, and comprehensive insurance coverage including general liability of $1,000,000 combined single limit, automobile liability of $1,000,000, workers' compensation as required by Georgia statute, and builder's all-risk insurance covering 100 percent of the contract value. Contractors must obtain all required permits, handle site restoration and temporary utilities, coordinate with ongoing facility operations, provide training to operations personnel, and deliver complete operations and maintenance manuals and record drawings upon project closeout.
The procurement documents do not specify any designated set-asides for disadvantaged enterprises or restrictions limiting contractor types beyond standard bonding and insurance requirements. No incumbent vendors or current contractors are identified in the available documentation. The project requires integration with existing FCWS infrastructure, specifically connection to the SCADA control systems at both water treatment plants and coordination with operational environments at active facilities. Contractors must verify existing utility locations, assess site conditions, and coordinate de-energization of all electrical systems prior to equipment removal. All work must comply with the National Electric Code, National Electric Safety Code, Georgia Building Code, and local regulations. The project is fully funded by Fayette County Water System, and while no specific contract value is disclosed, the scope encompasses equipment procurement, installation labor, instrumentation integration, and comprehensive project closeout services at two separate treatment facility locations.
Opportunity text
Fayette County, Georgia invites you to submit a bid for construction of the Alum System Improvements at both the Crosstown and South Fayette WTPs. Bids will be accepted until 3:00p.m., on Tuesday, November 25, 2025. Attached in PDF format, please find Invitation to Bid #26029-B FCWS ¿ Alum System Upgrades. If you have questions, contact Colette Cobb via email ccobb@fayettecountyga.gov.
Files
| File | Type | Posted |
|---|---|---|
| 26029_B Addendum 1.pdf | ||
| 26029_B ITB.pdf | ||
| 26029_B Drawings.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity