Install New Cable Rail Barriers along I-275
- Indiana Department of Transportation is inviting sealed bids for bridge replacement on CR 1300S and CR 100E in White County, with bids due September 2, 2026 at 10:00 a.m. Contractors must hold valid INDOT Certificates of Qualification and possess qualifications designated D(A) and 0250 to bid. The scope encompasses two bridge replacements: Bridge Replacement 91-00240 (Continuous Reinforced Concrete Slab) on CR 1300S over Moots Creek 0.49 miles west of Springboro Road, and Bridge Replacement...
- The Kentucky Transportation Cabinet, Division of Purchases, is requesting bids on an indefinite delivery/indefinite quantity (ID/IQ) contract for polypropylene barrier wall construction services across Districts 1–10 throughout Kentucky under RFB 605 2700000040, with bids due August 14, 2026 at 1:30 p.m. Eastern Time. Federal Highway Administration funding applies, requiring compliance with Davis-Bacon Act wage determinations and Buy America/Build America requirements; DBE program goals are 0...
- Indiana Department of Transportation is inviting sealed bids for bridge deck overlay and superstructure replacement on SR 56 in Washington County, with proposals due September 2, 2026 at 10:00 AM through Bid Express and project completion targeted for October 24, 2028. The DBE participation goal is 0.00 percent. The scope comprises two work items: a bridge deck overlay (056-88-02547) on a continuous steel beam over Highland Creek and CSX Railroad 0.07 mile east of SR 60, and superstructure...
- The Indiana Department of Transportation is inviting sealed bids for bridge coating, substructure repair, and rehabilitation work on various roads in Delaware County, with bids due September 2, 2026 at 10:00 a.m. The DBE goal is 0.00%. The scope encompasses 16 work items across seven highway routes (US 35N, US 35S, SR 67N, SR 67S, SR 3N, SR 3S, and Old SR 3 Ramp), involving eight bridge-coating items and eight substructure repair and rehabilitation items on continuous steel beams and composite...
- The Indiana Department of Transportation is inviting sealed bids for bridge replacement on CR 400N over Patoka River in Gibson County (Call 381 B-44287-A), with bids due September 2, 2026 at 10:00 a.m. through Bid Express Online Bidding Exchange. Bidders must hold a valid INDOT Certificate of Qualification at the D(A) level. The scope is labor, materials, tools, and equipment to construct a continuous reinforced concrete slab bridge structure located 0.4 miles west of CR 350E. Project completion...
- The Indiana Department of Transportation is inviting sealed bids for small structure replacement and pipe lining work on State Roads 446, 135, and 58 across four locations in Monroe, Lawrence, Brown, and Bartholomew counties, with proposals due September 2, 2026. All bidders must hold a valid Certificate of Qualification issued by INDOT. The scope encompasses replacement of a reinforced concrete box culvert on SR 446 over Unnamed Salt Creek tributary (5.10 miles north of SR 58) in Monroe County;...
- Indiana Department of Transportation is inviting sealed bids for bridge and small structure replacement on SR 58 in Bartholomew County, with the letting (bid opening) on September 2, 2026 at 10:00 a.m. Electronic bidding through Bid Express Online Bidding Exchange is mandatory, and bidders must hold a valid Certificate of Qualification from INDOT. The scope comprises two projects: Bridge Replacement 058-03-10816, a continuous reinforced concrete slab over White Creek 5.61 miles west of I-65, and...
- Hamilton County is soliciting sealed bids for the 146th Street and Hazel Dell Parkway Intersection Improvement Project, a comprehensive intersection reconstruction and new bridge construction initiative in Clay and Noblesville Townships, with bids due August 24, 2026 at 1:15 p.m. local time. Only contractors prequalified by the Indiana Department of Transportation for "Bridges: Highway Over Water," "Asphalt Pavement with Certified Hot Mix Asphalt Plant," or "Heavy...
- Indiana Department of Transportation is inviting sealed bids for Bridge Replacement 64-00001, a reinforced concrete slab bridge over Crooked Creek 3.5 miles east of SR 49 in Porter County, with electronic bids due September 2, 2026 at 10:00 a.m. and project completion required by July 30, 2027. The solicitation carries a zero DBE goal and no IVOSB, MBE, or WBE goals. Bidders must hold a valid INDOT Certificate of Qualification at level D(A) with qualification code 0250. All bids are submitted...
- The Indiana Department of Transportation is inviting bids for bridge thin deck overlay work on Interstate 65 in Newton County, with bids due September 2, 2026. The scope covers labor, materials, tools, and equipment for thin deck overlay restoration on two composite continuous steel beam bridges carrying I-65 North and South over Norfolk Southern Railroad, located 3.67 miles north of State Road 10. The work addresses deck preparation, material specifications, and quality standards to restore...
Indiana Department of Transportation is inviting bids for labor, materials, tools, and equipment to install new cable rail barriers along I-275 from 1.7 miles north to 0.71 miles south of Exit 17 in Dearborn County, with bids due September 2, 2026. Prevailing wage requirements apply to all labor. Work must comply with the Manual on Uniform Traffic Control Devices and current editions of the Indiana Standard Specifications for Road and Bridge Construction. Bidders must demonstrate experience with cable rail barrier installation and highway safety systems. The scope covers cable rail barrier installation across a 2.41-mile section of I-275, including furnishing and installing cable barrier systems in accordance with Indiana Department of Transportation standards and specifications. Technical requirements include specified gauge, tensioning, and post-spacing standards for cable rail materials. Compensation is structured on a unit basis per linear feet of barrier installed and associated hardware components. Project completion is expected within a defined timeframe following contract award, with milestone dates for material delivery and installation phases. Bonding and insurance requirements include performance bonds and liability coverage. The Indiana Department of Transportation will fund the project through state transportation funds, subject to federal-aid highway program requirements if applicable.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
Install New Cable Rail Barriers along I-275.pdf | 265KB | 8/5/26 |