IFB #S26-33364 Commercial Exhaust Hood Fire Suppression System, Service/ Repair, & Preventative Maintenance Service and Repair

Closed State & local contract opportunity Posted

Solicitation number
S26-33364
State
California
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from caleprocure.ca.gov. Updated .

About this opportunity

The California Department of Rehabilitation (DOR) Business Enterprises Program (BEP) has issued Invitation for Bid #S26-33364 for commercial exhaust hood fire suppression system service, repair, and preventative maintenance. The procurement seeks a qualified contractor to provide semiannual and as-needed maintenance services for commercial vent hood fire suppression systems located at multiple BEP cafeterias and food service facilities throughout California, including locations in Los Angeles, Orange County, San Diego, and other areas. Required services include inspections, testing, recharging systems, fire extinguisher maintenance, service tag updates, fusible link replacement, nozzle cleaning, cylinder hydrostatic testing, and system repairs to ensure compliance with Fire Department safety codes. The contractor must possess a current California C-16 Fire Protection Contractor License issued by the Contractors State Licensing Board and maintain Commercial General Liability insurance ($1,000,000 single/$2,000,000 aggregate), Automobile Liability insurance ($1,000,000 combined single limit), and Workers' Compensation coverage. Services must be performed five days per week between 7:00 a.m. and 5:00 p.m., with overtime work charged at 1.5 times the bid rate and Sunday/holiday work charged at twice the bid rate, both requiring prior written authorization. The deadline for submitting questions is April 9, 2026, at 5:00 p.m., with bid submission due April 17, 2026, at 2:00 p.m. and bid opening scheduled for April 20, 2026, at 2:30 p.m. via Zoom. Pricing must be submitted on a per-hour basis with labor rates binding for the entire contract term, with parts and materials charges not to exceed 40 percent of the contractor's wholesale costs and a maximum of $2,000 per job without written approval.

The DOR includes a Disabled Veterans Business Enterprise (DVBE) participation incentive with a goal of 3 percent DVBE participation and a maximum incentive cap of $100,000, providing responsive and responsible bidders evaluation advantages ranging from one to five percent based on their stated level of DVBE participation. Additionally, a five percent small business preference is available for certified small businesses submitting timely, responsive bids as responsible bidders, or a five percent non-small business preference for non-small business bidders committing to subcontract at least 25 percent of their net bid price with California-certified small businesses, with combined preferences capped at $100,000. The anticipated contract term runs from July 1, 2026, through June 30, 2029, with a total anticipated budget of approximately $90,000 for the three-year period ($30,000 annually), and includes an option to renew for one additional year under the same terms and conditions. The contract is subject to all applicable state and federal requirements, including debarment certification, compliance with civil rights laws, tax delinquency verification, and the Darfur Contracting Act. The anticipated award date is April 28, 2026, with a five-day protest period from April 21-27, 2026. Invoices must be submitted within 30 days of service completion or within five business days of Contract Administrator request, with all invoices due no later than 60 days after service and by November 1st annually for fund draw-down.

Opportunity text

Type of Service 1) The Department of Rehabilitation's (DOR) Business Enterprise Program (BEP) equipment is located in State, Federal, County office buildings, privately owned buildings cafeterias, snack bars, convenience stores and vending machine facilities. 2) The Contractor shall provide semiannual, or as required, commercial vent hood fire suppression system services, repairs and preventative maintenance for the BEP cafeterias. Services must be performed to comply with Fire Department safety codes. The contractor shall provide services to include but not limited to inspections, testing, recharging various types of commercial vent hood fire suppression systems, fire extinguishers and updating service tags. Contractor¿s inspections may lead to system repairs, fusible link replacement, nozzle cleaning, and cylinder hydrostatic testing and/or replacement of other parts of the Ansul fire suppression system box. Timely services must be provided to ensure the BEP vendor has limited interruption of business operations. This includes planning logistics, ensuring safety protocols, and coordinating with the Business Enterprises Consultant (BEC) and BEP vendors when necessary. B) Locations Locations listed in Exhibit G are subject to change. The Contractor will be notified through an amendment of any change in locations. C) Service Hours All Services shall be provided five (5) days a week, excluding holidays, between the hours of 7:00 a.m. to 5:00 p.m. For work which needs to be accomplished before or after normal working hours, a charge of one-and-one-half (1-1/2) times the bid rate will be granted. For work which needs to be accomplished on a Sunday or official State holiday, an amount of twice the bid rate will be granted. Prior authorization must be obtained, in writing, from the DOR's Contract Administrator and/or designee for time requested other than normal working hours, Sundays and official State holidays. A list of official State holidays is available from the DOR. D) Estimates The DOR's Contract Administrator and/or designee requires¿ the Contractor to provide an estimate prior to authorizing any services. E) Response Time From the time the DOR initiates a service request to the time the service commences shall not exceed twenty-four to forty-eight (24-48) hours, unless an extension of time is approved by the DOR's Contract Administrator and/or designee. Occasionally, the DOR will inform the Contractor that an emergency condition exists and the Contractor shall complete the required service within a twenty-four (24) hour period to the satisfaction of the DOR. In general, service shall be completed within a reasonable and acceptable time period to the DOR taking into consideration the nature and degree of the difficulty of the work involved. Emergency shall be defined as a health and safety or hazardous working environment situation. F) Call Back Services All work shall be under warranty for thirty (30) days from date of completed repair. Time and costs for call backs to previous repairs under warranty shall be borne by the Contractor. G) Notification The Contract Administrator will notify the Contractor, via an Authorization for Repairs and Service - DR 1308, of location(s) requiring service and location contact person. The Contractor shall schedule service date(s) and time(s) with the BEP vendor. If the BEP vendor or designee is not on site at the scheduled time and date, the Contractor is to contact the Contract Administrator/designee for further instructions. If Contract Administrator/designee cannot be reached, Contractor is to leave the site without performing any service and will charge the DOR one (1) hour at the Contract labor rate. The Contractor shall obtain the BEP vendor or designee¿s signature on the Authorization for Repairs and Service - DR 1308 upon work completion and verification that equipment is in working order and submit signed Authorization for Repairs and Service - DR 1308 for payment. H) Verification of Arrival The Contractor/service technician is required to have the BEP vendor or his or her staffs verify time of arrival on the job site, as well as the time of departure. BEP vendor or his or her staff must be on site while the service is being performed. The Contractor shall leave a copy of the work order signed by the BEP vendor or his or her staff indicating: 1) minimum time of arrival; 2) time of departure; and 3) general description of work performed at the location. I) Parts and Materials The charges for parts and materials shall not exceed forty percent (40%) of the Contractor's wholesale costs; excluding tax, i.e.; $100.00 parts cost x 40%x 7.75 (City Sales) Tax = $129.30. The Department of Rehabilitation may pay any applicable sales and use tax imposed by another State. Only original manufacturer parts and materials shall be used. Removed parts shall be left at the location with the BEP vendor or his or her staff for BEP inspection. The maximum amount that may be charged per job shall be $2,000.00. The maximum amount that may be charged per job may be increased with the approval of the Contract Administrator or the Business Enterprise Program Manager. See Exhibit B - paragraph 1. Invoicing and Payments - Item 9 for parts and materials cost reimbursements. Used or refurbished or rebuilt parts are not allowed. J) Freight Charges Contractor will be allowed to recover freight or shipping costs for parts, with no allowance for mark-up, by: 1) Itemizing the cost of freight or shipping on the invoice. 2) Attaching a copy of the freight or shipping invoice (original whenever possible) to the invoice. 3) An original receipt is required for any freight/shipping cost over $50.00. 4) When the freight or shipping invoice includes costs not specifically associated with the billing, the Contractor will only charge for the costs associated with the billing and note the freight or shipping invoice accordingly. K) Work Area Contractor will ensure that the work area is kept clean and free of debris, as necessary, to maintain a safe working environment in and around the location. While working on equipment, Contractor agrees to perform services with as little disruption to the State¿s and BEP vendor operations as possible. All tools, equipment and other work materials belonging to the Contractor will be removed from the work location at the end of each working day. The State shall not be responsible for storage of any Contractor property. L) State Property 1) It shall be the Contractor's responsibility to make all necessary arrangements with office or building manager and local traffic authorities for use of elevators, loading docks, adjacent streets, sidewalks, and/or malls. 2) Any damages by the Contractor to portions of building, premises, equipment, furniture, material or other property will be repaired or items will be replaced by Contractor to the satisfaction of the DOR with no expense to the DOR. 3) Any damages by the Contractor to portions of buildings or premises for which the DOR is responsible, the DOR may, itself, at its option, repair or replace damages and deduct the cost thereof from the Contractor's invoice. 4) Contractor shall provide dust covers, temporary dust barriers, pads, etc., as required to protect building occupants and contents during its operation. Any items lost or stolen while in the Contractor's custody will be replaced by the Contractor at no expense to the State/Federal government. Contractor must receive approval from the State/Federal government to remove equipment from a location. 5) Floors, walls, and ceilings of buildings, including elevators, will be adequately protected by Contractor to prevent marring and scratching or other damages. The State may, itself, at its option, repair any damage or replace any lost or stolen items and deduct the cost thereof from Contractor's invoice. 6) Contractor shall keep site clean as work progresses. Upon completion of the work, all surfaces involved in this project shall be clean of any foreign material. Contractor shall remove all waste materials from the work site and dispose of as required to maintain a safe working environment.

Files

File Type Posted
CERTIFIED_SB_PARTICIPATION_FORM.pdf PDF
Darfur_Form.pdf PDF
IFB_Solicitation_-_S26-33364.pdf PDF
IFB_Packet_127462.pdf PDF
DVBE_INCENTIVE_FORM.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors