IFB #C25-33114 Refrigeration Service & Repair (Fresno, Merced, and Madera Counties)

Closed State & local contract opportunity Posted

Solicitation number
C25-33114
State
California
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from caleprocure.ca.gov. Updated .

About this opportunity

The California Department of Rehabilitation (DOR) has issued Invitation for Bid #C25-33114 for commercial refrigeration service and repair across Fresno, Merced, and Madera Counties. The procurement seeks a qualified contractor to provide comprehensive refrigeration maintenance and repair services for the Business Enterprise Program (BEP) equipment located in state, federal, county office buildings, cafeterias, snack bars, convenience stores, and vending facilities. Contractors must possess a C38 Refrigeration Contractor license, EPA certification for technicians, and comply with refrigerant recovery and recycling regulations. The solicitation requires service for 16 pieces of refrigeration equipment, including walk-in and reach-in refrigerators and freezers, with technicians required to respond within four hours of a service request. Key deliverables include timely repairs, safety protocol adherence, and coordination with Business Enterprises Consultants. The bid response is due by September 22, 2025, with a public bid opening on September 23, 2025, and an anticipated contract award date of October 21, 2025. Evaluation will consider factors such as licensing, certification, insurance coverage, and compliance with state regulations.

The contract includes several set-aside and participation incentives for disadvantaged businesses. A Disabled Veterans Business Enterprise (DVBE) program allows bidders to receive up to 5% evaluation points for committing to use a certified DVBE subcontractor for at least 1% of the contract value. Additionally, a Small Business Participation program offers a 5% calculation preference for certified small businesses and microbusinesses. Bidders must provide proof of insurance, including $1,000,000 in commercial general liability coverage, and submit various certifications regarding civil rights, tax compliance, and business standing. The total anticipated budget is $30,000 for a three-year term from contract approval through September 30, 2028, with parts costs limited to a 20% markup and a maximum of $2,000 per job. Contractors will be reimbursed for parts and labor, with strict requirements that equipment cannot be removed from a location without written approval from a Business Enterprises Consultant or Contract Administrator. The solicitation emphasizes that any additional work beyond the initial Authorization for Repairs and Service must receive prior written approval.

Opportunity text

A) Type of Service 1) The Department of Rehabilitation's (DOR) Business Enterprise Program (BEP) equipment is located in State, Federal, County office buildings, privately owned buildings cafeterias, snack bars, convenience stores and vending machine facilities. 2) The Contractor shall provide service and repairs on commercial refrigeration that includes but is not limited to ice machines, frozen yogurt machines (refrigeration only), walk-in and reach-in refrigerators and freezers for DOR BEP cafeterias, snack bars, roadside rests, and vending facilities at locations such as CDCR correctional facilities, state and federal buildings. Timely services must be provided to ensure the BEP vendor has limited interruption of business operations. This includes planning logistics, ensuring safety protocols, and coordinating with the Business Enterprises Consultant (BEC) and BEP vendors when necessary. All repairs must be quoted for approval. Equipment is not to be removed from a location without the written approval of a BEC or the Contract Administrator. No exceptions. Contractors can only remove equipment when approval has been received in writing granting authorization. The Contractor shall provide service listed on the Authorization for Repairs and Service (DR 1308) only. If additional work is required, the Contractor shall obtain approval from the Contract Administrator/designee prior to additional work commencing. B) Locations Locations listed in Exhibit G are subject to change. The Contractor will be notified in writing of any change in locations. C) Service Hours All Services shall be provided five (5) days a week, excluding holidays, between the hours of 7:00 a.m. to 5:00 p.m. For work which needs to be accomplished before or after normal working hours, a charge of one-and-one-half (1-1/2) times the bid rate will be granted. For work which needs to be accomplished on a Sunday or official State holiday, an amount of twice the bid rate will be granted. Prior authorization must be obtained, in writing, from the DOR's Contract Administrator and/or designee for time requested other than normal working hours, Sundays and official State holidays. A list of official State holidays is available from the DOR. D) Estimates The DOR's Contract Administrator and/or designee requires¿ the Contractor to provide an estimate prior to authorizing any services. E) Response Time From the time the DOR initiates a service request to the time the service commences shall not exceed four (4) hours, unless an extension of time is approved by the DOR's Contract Administrator and/or designee. Occasionally, the DOR will inform the Contractor that an emergency condition exists and the Contractor shall complete the required service within a six (6) hour period to the satisfaction of the DOR. In general, service shall be completed within a reasonable and acceptable time period to the DOR taking into consideration the nature and degree of the difficulty of the work involved. Emergency shall be defined as a health and safety or hazardous working environment situation. F) Call Back Services All work shall be under warranty for thirty (30) days from date of completed repair. Time and costs for call backs to previous repairs under warranty shall be borne by the Contractor. G) Notification The Contract Administrator will notify the Contractor, via an Authorization for Repairs and Service - DR 1308, of location(s) requiring service and location contact person. The Contractor shall schedule service date(s) and time(s) with the BEP vendor. If the BEP vendor or designee is not on site at the scheduled time and date, the Contractor is to contact the Contract Administrator/designee for further instructions. If Contract Administrator/designee can not be reached, Contractor is to leave the site without performing any service and will charge the DOR one (1) hour at the Contract labor rate. The Contractor shall obtain the BEP vendor or designees signature on the Authorization for Repairs and Service - DR 1308 upon work completion and verification that equipment is in working order and submit signed Authorization for Repairs and Service - DR 1308 for payment. H) Verification of Arrival The Contractor/service technician is required to have the BEP vendor or his or her staffs verify time of arrival on the job site, as well as the time of departure. BEP vendor or his or her staff must be on site while the service is being performed. The Contractor shall leave a copy of the work order signed by the BEP vendor or his or her staff indicating: 1) minimum time of arrival; 2) time of departure; and 3) general description of work performed at the location. I) Parts and Materials The charges for parts and materials shall not exceed twenty percent (20%) of the Contractor's wholesale costs; excluding tax, i.e.; $100.00 parts cost x 20% x 7.75 (City Sales) Tax = $129.30. The Department of Rehabilitation may pay any applicable sales and use tax imposed by another State. Only original manufacturer parts and materials shall be used. Removed parts shall be left at the location with the BEP vendor or his or her staff for BEP inspection. The maximum amount that may be charged per job shall be $2,000.00. The maximum amount that may be charged per job may be increased with the approval of the Contract Administrator or the Business Enterprise Program Manager. See Exhibit B - paragraph 1. Invoicing and Payments - Item 9 for parts and materials cost reimbursements. Used or refurbished or rebuilt parts are not allowed. ¿ J) Freight Charges Contractor will be allowed to recover freight or shipping costs for parts, with no allowance for mark-up, by: 1) Itemizing the cost of freight or shipping on the invoice. 2) Attaching a copy of the freight or shipping invoice (original whenever possible) to the invoice. 3) An original receipt is required for any freight/shipping cost over $50.00. 4) When the freight or shipping invoice includes costs not specifically associated with the billing, the Contractor will only charge for the costs associated with the billing and note the freight or shipping invoice accordingly. K) Work Area Contractor will ensure that the work area is kept clean and free of debris, as necessary, to maintain a safe working environment in and around the location. While working on equipment, Contractor agrees to perform services with as little disruption to the States and BEP vendor operations as possible. All tools, equipment and other work materials belonging to the Contractor will be removed from the work location at the end of each working day. The State shall not be responsible for storage of any Contractor property. L) State Property 1) It shall be the Contractor's responsibility to make all necessary arrangements with office or building manager and local traffic authorities for use of elevators, loading docks, adjacent streets, sidewalks, and/or malls. 2) Any damages by the Contractor to portions of building, premises, equipment, furniture, material or other property will be repaired or items will be replaced by Contractor to the satisfaction of the DOR with no expense to the DOR. 3) Any damages by the Contractor to portions of buildings or premises for which the DOR is responsible, the DOR may, itself, at its option, repair or replace damages and deduct the cost thereof from the Contractor's invoice. 4) Contractor shall provide dust covers, temporary dust barriers, pads, etc., as required to protect building occupants and contents during its operation. Any items lost or stolen while in the Contractor's custody will be replaced by the Contractor at no expense to the State/Federal government. Contractor must receive approval from the State/Federal government to remove equipment from a location. 5) Floors, walls, and ceilings of buildings, including elevators, will be adequately protected by Contractor to prevent marring and scratching or other damages. The State may, itself, at its option, repair any damage or replace any lost or stolen items and deduct the cost thereof from Contractor's invoice. 6) Contractor shall keep site clean as work progresses. Upon completion of the work, all surfaces involved in this project shall be clean of any foreign material. Contractor shall remove all waste materials from the work site and dispose of as required to maintain a safe working environment.

Files

File Type Posted
DGS_CERTIFIED_SB_PARTICIPATION.pdf PDF
IFB_C25-33114.pdf PDF
STD204.pdf PDF
DVBE_INCENTIVE.pdf PDF
Darfur_Contracting_Act_Certification_Form.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors