About this opportunity
The Pueblo West Metropolitan District (PWMD) is seeking competitive bids for the IFB-2025-WA-2308 PRV Installation project, an infrastructure improvement initiative involving the installation of five Pressure Relief Valve (PRV) Systems at strategic locations in Pueblo West, Colorado. The project requires qualified construction companies to complete comprehensive PRV vault installations off existing 8-inch or 6-inch asbestos-cement water mains, encompassing extensive technical work including piping, demolition, earthwork, erosion control, valve installations, and site-specific tie-ins. Bidders must provide all necessary labor, equipment, materials, and supervision to ensure a fully functional system, with pricing to be all-inclusive covering freight, travel, fuel, setup, and takedown costs. A non-mandatory pre-bid meeting is scheduled for September 30, 2025, at 10:00 a.m. MT, with electronic bids due by October 22, 2025, at 2:00 p.m. MT. The project requires a mandatory 5% Bid Bond, and contractors must demonstrate capability to coordinate work across multiple trades, subcontractors, suppliers, and public utilities.
The PWMD encourages participation from minority, small, disadvantaged, and women-owned enterprises, signaling a commitment to inclusive procurement practices. While a specific contract value is not explicitly stated, the comprehensive scope and multiple installation sites suggest a significant infrastructure investment. The successful bidder will be required to provide a Performance Bond, Labor and Materials Payment Bond, and Certificates of Insurance, with a contract duration of 60 calendar days and liquidated damages of $1,400 per working day for project delays. Bid documents are available through the Rocky Mountain E-Purchasing website, and interested contractors must carefully review all documentation to ensure compliance with technical specifications and project requirements. The project locations include areas near W. Linden Ave, S. Greenway Ave, W. Northampton Dr., S. Papago Dr., S. Hollister Dr., and S. Sweetwater Ave, indicating a distributed infrastructure improvement strategy across the Pueblo West metropolitan area.
Opportunity text
The Pueblo West Metropolitan District ("District") is soliciting competitive bids from qualified and interested construction companies for all labor, equipment, materials, etc. required to install five (5) Pressure Relief Valve Systems "PRV'S" in Pueblo West, CO. The PRV's will be located near the intersection of W. Linden Ave and S. Greenway Ave.; S. Greenway Ave and W Northampton Dr.; S. Papago Dr and Parcel H, Tract 362 owned by Pueblo West Metropolitan District; S. Hollister Dr. and Parcel F, Tract 362 owned by Pueblo West Metropolitan District; and S. Sweetwater Ave. and Parcel E owned by Pueblo West Metropolitan District. Pricing shall be all inclusive to include but not limited to: all labor, equipment, supplies, materials, freight, travel, fuel, set-up and take-down costs, and all other costs related to the successful completion of the project. The Project will include all necessary labor, supervision, equipment, tools and materials for the installation of five (5) pressure-reducing valve (PRV) vaults off either an existing 8-inch or 6-inch asbestos-cement water main. Work includes, but is not limited to, piping, demolition, earthwork, erosion control, valves, tie-ins and related appurtenances, installation of Owner-supplied materials, coring and/or sealing of vault, and completion of all associated site work relating to the PRV project for a complete and functional system. Contractor shall furnish and pay for all materials not included in the Owner-supplied Bid Form, equipment, supplies, and appurtenances; provide all construction equipment and tools; and perform all necessary labor and supervision. Contractor shall coordinate the progress of the Work including coordination between trades, subcontractors, suppliers, public utilities and subsequent water treatment plant contractor performing work on site and Owner to insure the progress of Work.
Files
| File | Type | Posted |
|---|---|---|
| IFB-2025-WA-2308 PRV Installation.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities