About this opportunity

The Pennsylvania Department of Transportation is soliciting bids for reconstruction of the I-81 Exit 219 interchange (Gibson) in Susquehanna County, with proposals due October 1, 2026. The scope spans approximately 1.5 miles on State Route 81, Section 590, in Harford and New Milford Townships.

Work includes relocation of the southbound off-ramp (Ramp H), reconstruction and geometry improvement of remaining ramps, shoulder improvement with mill and overlay, State Route 848 widening and reconstruction, and State Route 2081 and T-561 reconstruction. Structural and geotechnical scope encompasses replacement of the SR 848 over SR 0081 bridge (S-37456), replacement of the Ramp G culvert (S-37453), construction of a new Ramp H culvert (S-37454), extension of the existing SR 848 culvert (S-37455), geoengineered reinforced soil slopes, soil nails, and rock fill slopes. A separate culvert replacement on S.R. 1022 (Liberty Park Road) will involve a precast reinforced concrete box culvert (12 feet span by 7 feet 6 inches rise) replacing an existing metal pipe culvert over an unnamed tributary to Dubois Creek.

Additional components include new signing, pavement markings, highway lighting, intelligent transportation systems devices, utility relocations, drainage replacement or upgrade (including 72 jack and bore operations across I-81), barrier protection, and guiderail installation. Traffic will be maintained through staged construction with temporary signals at bridge approaches.

The bid package and approved drawings are available in the referenced government file (840747padot75976.pdf).

Opportunity text

The Pennsylvania Department of Transportation (PennDOT) proposes to replace a steel pipe culvert on S.R. 1022 (Liberty Park Road) over a UNT to Dubois Creek in Liberty Township, Susquehanna County. The proposed structure will replace the existing metal pipe culvert on a similar alignment with a precast reinforced concrete box culvert that w Scope of work involves reconstruction of the I-81 Exit 219 interchange (Gibson) including relocation of the SB off-ramp (Ramp H), reconstruction and geometry improvement of the remaining existing ramps, shoulder improvement and mill and overlay, SR 848 widening and reconstruction and SR 2081 and T-561 reconstruction. Structure and Geotech scope includes replacement of the SR 848 over SR 0081 bridge (S-37456), replacement of the Ramp G culvert (S-37453), construction of a new Ramp H culvert (S-37454), extension of the existing SR 848 culvert (S-37455), GRS Slope, Soil Nails and Rock Fill slopes. Traffic will be maintained using staged construction including temporary signals at the bridge approaches. Also includes new signing, pavement markings, highway lighting, ITS devices, utility relocations, replacement or upgrade of drainage (including 72 jack and bore across I-81) and barrier protection and other miscellaneous construction, as indicated on the approved drawings included in the bid package for State Route Sr 81, Section 590, in Susquehanna County, Harford and New Milford Townships from approximately 0.7 miles south of SR 848 at NB/SB segment 2184/2185 offset 0978/1008 to approximately 0.8 miles north of SR 848 at NB/SB segment 2200/2201 offset 0856/0944.ill accommodate two lanes of traffic. The proposed 12'-0" span by 7'-6" rise precast reinforced concrete box culvert will provide a larger hydraulic opening relative to the existing structure. Minor grading will be required along S.R. 1022 at the approaches to the structure as a result of the roadway reconstruction, drainage improvements, and guiderail installation. Due to the contextual restraints of the project site, S.R. 1022 will be closed to traffic throughout the duration of construction. An 11.3 mile detour route will be implemented for S.R. 1022.