I-80 Bridge over Cornhusker Highway
Closed State & local contract opportunity Posted
- Solicitation number
- STR-80-9(1226)
- State
- Nebraska
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Gayle Dietz ndot.procurementsourcing@nebraska.gov (402) 471-4567
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The State of Nebraska is requesting bids for repairs and maintenance of the I-80 Bridge over Cornhusker Highway in Blaine County, with bids due October 1, 2026.
The scope includes full-depth concrete repairs and panel replacements on specific bridge sections spanning the local highway corridor. Work involves installation of new transverse joints with three dowel bars per wheel path to tie existing pavement to newly replaced panels, full-depth diamond saw cuts along longitudinal joints, and application of bond breakers to control structural shifts and prevent reflective cracking.
The bid notice was posted September 20, 2026. A complete bid package including project specifications, drawings, contract terms, pricing structure, pre-bid meeting or site-visit details, contract award timeline, and funding information is contained in the attached Bid Notice document (26 MB PDF).
Opportunity text
Scope of Work: Repairing & maintaining the bridge structures spanning the local highway corridor; specific sections require full-depth concrete repairs and panel replacements; installation of new transverse joints, which involves placing three (3) dowel bars per wheel path to properly tie the existing pavement to the newly replaced panels and execution of full-depth diamond saw cuts along longitudinal joints and applying bond breakers to control structural shifts and prevent premature reflective cracking.
Files
| File | Type | Posted |
|---|---|---|
| Bid Notice- I-80 Bridge over Cornhusker Highway.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity