Hurricane Ridge Rockfall Mitigation MP 9. 4

Open State & local contract opportunity Posted

Solicitation number
69056726B000010, WA NP OLYM 12(8)
State
Washington
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Washington Department of Transportation is soliciting bids on Hurricane Ridge Rockfall Mitigation (MP 9.4), a highway and bridge construction project under a Total Small Business Set-Aside, with bids due November 4, 2026. The project is located approximately 9 miles south of Port Angeles in Clallam County, Washington (GPS coordinates 48°0'23.66"N, 123°22'37.27"W).

The scope encompasses construction and completion of work including earthwork, aggregate and base courses, asphalt and rigid pavements, bridge construction, and incidental construction work. The contractor must provide all necessary labor, materials, equipment, tools, transportation, and supplies to complete the work according to contract documents. Technical and performance requirements are governed by the FP-24 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, organized across 10 divisions covering general requirements, project requirements, and specific construction categories. The contractor must submit electronic documentation in approved formats, provide as-built drawings with accurate record of changes, and comply with all federal, state, and local requirements including OSHA standards, environmental regulations, and traffic control procedures. Payment is made according to actual quantities performed and accepted; bid schedule quantities are considered approximate unless designated as contract quantities.

This is a Total Small Business Set-Aside under NAICS code 237310 (Highway, Street, and Bridge Construction). All construction is governed by the Federal Acquisition Regulation (FAR), Title 48 CFR Chapter 1, and the Transportation Acquisition Regulation (TAR), Title 48 CFR Chapter 12.

Opportunity text

Total Small Business Set-Aside, 237310 - Highway, Street, and Bridge Construction. The project work is located 9 miles south of Port Angeles in Clallam County, Washington. Approximate Global Positioning System (GPS) coordinates for the beginning of the project are 48 0'23.66"N, 12322'37.27"W. The intent of the contract is to provide for the construction and completion of the work described in the contract documents. The precise details of performing the work are not described, except as considered essential for the successful completion of the work. Provide labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the contract.

Files

File Type Posted
fp-24.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity