Hurricane Creek Wastewater Treatment Plant Clarifiers Mechanism Reconstruction and Improvements Project
Closed State & local contract opportunity Posted
- Solicitation number
- L-331
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Eddie Aguilar eaguilar@ega-llc.com (936) 634-5528
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Angelina County, Texas is requesting bids on clarifiers mechanism reconstruction and improvements at Hurricane Creek Wastewater Treatment Plant, with bids due September 10, 2026.
The base bid scope includes removal, disassembly, inspection, rebuild, and reinstallation of the existing 48-inch turntable assembly, drive platform, and catwalk for each of five clarifiers; replacement of worn bearings, seals, and wear wings; and repair and re-leveling of V-notch weirs and baffles across all five units. Additive alternate bid items cover reconditioning and replacement of catwalk structural support systems with hot-dip galvanized grating and handrails meeting OSHA Regulations in the three secondary clarifiers; furnishing and installing new structural support systems, hot-dip galvanized grating, and handrails in the two primary clarifiers; interior concrete surface cleaning, preparation, and application of specified Tnemec Series N218 MortarClad and Tnemec Series 436 Perma-Shield FK coating systems to all five clarifiers per Specification Section 09800-1; and furnishing and installing new access stairs with handrails connecting clarifier catwalks to existing sidewalks for all five units, with stairs and handrails meeting OSHA Regulations.
No estimated contract value, contract term, incumbent contractor, evaluation criteria, pre-bid meeting, site visit, or question deadline is identified in the source.
Opportunity text
Base Bid: Remove the existing 48-inch turntable assembly, drive platform and catwalk for each clarifier; disassemble, inspect, rebuild, and re-install the assembly, including replacement of worn bearings, seals, and wear wings. Repair and re-level the V-notch weirs and baffles in all five (5) clarifiers. Additive Alternate Bid Items: Recondition the existing catwalk structural support system and install new hot-dip galvanized grating and handrails in the three (3) secondary clarifiers. Grating and handrails shall meet OSHA Regulations. Furnish and install a new structural support system, hot-dip galvanized grating, and handrails for the two (2) primary clarifiers. Grating and handrails shall meet OSHA Regulations. Clean and prepare all interior concrete surfaces of the five (5) clarifiers and apply the specified Tnemec Series N218 MortarClad and Tnemec Series 436 Perma-Shield FK coating systems in accordance with the Specification Section 09800-1. Furnish and install new access stairs with handrails connecting the clarifier catwalks to the existing sidewalks for all five (5) clarifiers. Stairs and handrails shall meet OSHA Regulations.
Files
| File | Type | Posted |
|---|---|---|
| Contract Documents_ Specifications _ Drawings.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity