Cobb County-Marietta Water Authority is soliciting sealed bids for the Hugh A. Wyckoff Water Treatment Plant Filter Rehabilitation Project, with bids due October 25, 2022 at 10:00 a.m. and hand-delivery required at 1170 Atlanta Industrial Drive, Marietta, Georgia 30066. Bidders must be pre-qualified State of Georgia licensed Utility Contractors or General Contractors — a mandatory eligibility filter. A mandatory pre-bid conference was held September 27, 2022 at the treatment plant; failure to attend rendered a bid ineligible.

The scope encompasses demolition of media and underdrain systems in six existing filters, installation of stainless steel underdrain systems in those six filters, and installation of new media. Hazen and Sawyer serves as the project engineer. Work is to be awarded in a single contract with substantial completion required within 410 consecutive calendar days and final completion within 440 consecutive calendar days from commencement.

The contract was awarded on November 21, 2022 to REHAB Construction Company, Inc. (Conyers, Georgia) as the verified low bidder at $3,130,000. Bid submissions required a notarized Non-Collusion Affidavit, Contractor's License Certification, Bid Bond at five percent of total contract amount, Security and Immigration Compliance Act Certification, and evidence of authority to conduct business in Georgia for out-of-state entities. The successful bidder must provide a Performance Bond, Payment Bond, Certification of Contractor's Attorney, and Pre-Construction Oath from all persons procuring the agreement; Subcontractor Affidavits are required as subcontractors are brought under contract. Bidders were required to obtain complete contract documents from Quest CDN (Project Number 8288694) for a nonrefundable $15 fee. Questions were due September 29, 2022 at 4:00 p.m. directed to Bevis Pigott at bpigott@hazenandsawyer.com. All bids remained subject to acceptance for 90 days following the bid opening. Unsealed, facsimile, and email bids were not accepted; the bid opening was conducted by the Engineer with witnesses from the Owner, and results were distributed by email to all bidders. Public and bidder attendance at the bid opening was not permitted.

Opportunity text

Hugh A. Wyckoff WTP Filter Rehabilitation Project Due to the ongoing COVID-19 epidemic, Cobb County-Marietta Water Authority has limited administration staff working at this time. In order to ensure that all bid packages are received by the due date and time, Cobb County-Marietta Water Authority requires all bid packages to be hand-delivered on October 25, 2022, at 10:00 am. Bids received after the designated time will not be considered. The bid packages will be opened by a representative of the Engineer and witnessed by at least one representative of the Owner and a summary of the submitted bids will be sent by email to all Bidders. Bidders or the public may not attend the bid opening. Unsealed Bids, including facsimile Bids or Bids sent by e-mail, will not be considered. The Owner of the project is Cobb County-Marietta Water Authority. The Engineer for the project is Hazen and Sawyer. Bid opening time is subject to extension pursuant to O.C.G.A Section 36-91-20(d). Bidders shall inform themselves concerning Georgia Laws and comply with same. The Project includes, but is not limited to, the following items • Demolish media and underdrain system in six (6) existing filters. • Install stainless steel underdrain system into six filters. • Install new media into the six (6) filters. The time allowed for Substantial Completion is 410 consecutive calendar days, and the time allowed for final completion and readiness for final payment is 440 consecutive calendar days from the date of commencement. THE WORK will be awarded in one Contract. **Please see attachment for more details.**

Files

File Type Posted
Award Information —
Wyckoff Filter Rehab Project —
Addendum 1 —

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity