Howard Home- Cooling Tower Pump Replacement
Closed State & local contract opportunity Posted
- Solicitation number
- SRC0000036843
- State
- Alabama
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from alabamabuys.gov. Updated .
About this opportunity
Colonel Robert L. Howard State Veterans Home in Pell City, Alabama is soliciting bids for cooling tower pump replacement, with proposals due October 5, 2026. This is a condensed timeline — less than five business days from posting to deadline.
The scope is removal of one Armstrong condenser water pump and replacement with a new Taco brand vertical inline pump and motor serving the cooling tower condenser water system. Work includes disconnection and removal of the existing pump, furnishing and installation of the new Taco unit, reconnection of condenser piping, and startup and checkout of new pump operation. All labor, materials, equipment, and travel are included in the contract price. The pump carries a four-week lead time for delivery. Work must be completed during regular business hours, Monday through Friday, 8:00 a.m. to 4:00 p.m. The price does not include any service or repairs to tower systems beyond the pump replacement scope.
Place of performance is 7054 Veterans Parkway, Pell City, AL 35125. Contact Hillary Hardwick at 205-338-6487 for inquiries.
No contract value, contract term, evaluation criteria, pre-bid meeting, or question deadline are specified in the available source material.
Opportunity text
Colonel Robert L. Howard State Veterans Home Cooling Tower #1 - Pump Replacement Location: Colonel Robert L. Howard State Veterans Home 7054 Veterans Pkwy Pell City, AL, US 35125 Contact: Hillary Hardwick 205-338-6487 Project: Condenser Water Loop Investigation, Leak Detection & System Restoration Scope of Work: Furnish the labor, materials and equipment to perform the following scope of work: Remove (1) Armstrong condenser water pump, and replace with new Taco brand pump equivalent. · Disconnect and remove existing pump. · Furnish and install (1) Taco Vertical Inline pump and motor, serving condenser water system. · Re-connect condenser piping connections, · Start-up and checkout new pump operation. · Pump lead time is (4) weeks for delivery. · All trip and travel are included Notes and Clarifications: · All work to be completed during regular business hours. M-F, 8-4 pm. · Price does not include any service or repairs to tower systems, if required.
Files
| File | Type | Posted |
|---|---|---|
| DOPQQBPV4.08.26.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity