Hosston River Road Bridge Over Kelly Bayou
Open State & local contract opportunity Posted
- Solicitation number
- H.014981
- State
- Louisiana
- Responses due
Opportunity facts
- Jurisdictions
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Louisiana Department of Transportation and Development is soliciting bids for the Hosston River Road Bridge over Kelly Bayou in Caddo Parish, with bid opening at 10:00 a.m. on November 18, 2026. Electronic bidding through www.bidx.com is mandatory, prior online bidder registration is required, and no paper bids are accepted. The winning bidder must hold a Louisiana contractor license under R.S. 37:2150-2165 for Highway, Street, and Bridge Construction. The project has no specific DBE/SBE goal but obligates compliance with general DBE/SBE participation requirements.
The work covers clearing and grubbing, removal of an existing timber bridge, grading, class II base course, asphalt concrete pavement, cabled articulated concrete block mattress, precast concrete piles, precast-prestressed concrete girders, and a concrete girder span bridge. The project is a 0.105-mile segment classified as local roads on a non-NHS route and is a Federal Aid Construction Project. Build America Buy America requirements apply, and all materials must be U.S. manufactured unless a waiver is granted, with foreign materials limited to 0.1 percent of total contract cost or $2,500, whichever is greater. Contractors must comply with the 2026 Louisiana Standard Specifications for Roads and Bridges, process payroll electronically through AASHTOWare Civil Rights & Labor Software, and apply payment adjustments for asphalt cements, fuels, and steel.
The estimated cost range is $2.5 million to $5 million. Contract time is 130 working days after Notice to Proceed, including an initial 90-day assembly period before regular construction operations begin. Commercial General Liability coverage carries combined single limits from $1 million to $5 million depending on contract amount, in addition to Owner's and Contractor's Protective Liability and Business Automobile Liability coverage. The contractor must maintain traffic throughout the project, with roadway closures limited to local traffic. Two potential trainees are estimated, with 2,000 trainee hours available for reimbursement.
Claudia Krug is the project engineer and Ryan Rodney is the project manager.
Opportunity text
Clearing and grubbing, removal of timber bridge, grading, class II base course, asphalt concrete pavement, cabled articulated concrete block mattress, precast concrete piles, precast-prestressed concrete girders, concrete girder span bridge, and related work.
Files
| File | Type | Posted |
|---|---|---|
| ladot_h.014981_proposal.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity