Hoback Junction - Jackson (Rice Slide)

Closed State & local contract opportunity Posted

Solicitation number
NHPP-N104098
State
Wyoming
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Wyoming Department of Transportation (WYDOT) is soliciting bids on a slide repair and stabilization project on US 26/89 between Hoback Junction and Jackson in Teton County, with proposals due October 8, 2026 at 10:00 a.m. MDT. Pre-qualification and mandatory attendance at a pre-bid meeting and site review on September 16, 2026 are required conditions of bidding.

The scope spans approximately 0.4 mile of roadway beginning at reference marker 143.07 and includes excavation; topsoil stripping, storage, and placement; erosion control measures; asphalt pavement installation; slide stabilization rock placement; shotcrete application; and installation of reinforcing steel and timber lagging. The estimated project completion date is October 31, 2027.

The pre-bid meeting and site review will be held September 16, 2026 from 10:00 a.m. to 2:30 p.m. at the Teton County Library in Jackson, with a presentation from 10:00 a.m. to 11:30 a.m. followed by a site visit from 1:30 p.m. to 2:30 p.m. Mandatory attendance is required for all prime contractors. Bid proposals must be submitted electronically through the WYDOT iCX system. The bid opening will be conducted online via Zoom and in-person at WYDOT Headquarters in Cheyenne. Project documents are available for download from QuestCDN for $35.00. Inquiries regarding project documents and attendance list requests should be directed to project engineer Bob Hammond at bob.hammond@wyo.gov. The project is funded under Call Order 006 - NHPP-N104098.

Opportunity text

Description: Slide Repair; Involving excavation; stripping, storing, and placing topsoil; placing erosion control measures, asphalt pavement, slide stabilization rock, and shotcrete; and installing reinforcing steel and timber lagging on US 26/89 beginning at RM 143.07 between Hoback Junction & Jackson for approximately 0.4 mile in Teton County. Estimated Completion Date: Oct. 31, 2027

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity