Hidden Valley Road, Toledo

Closed State & local contract opportunity Posted

Solicitation number
02-001-27
State
Oregon
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Central Lincoln People's Utility District is requesting bids to install underground utility infrastructure on Hidden Valley Road in Toledo, Oregon, with bids due August 3, 2026.

The scope includes installation of approximately 18,060 linear feet of 1–2" HDPE primary conduit at 4-foot depth and 1,550 linear feet of 1–3" HDPE or Schedule 40 PVC secondary conduit at 3-foot depth. The work also encompasses installation of twenty-three PE-36 hand holes, twenty-three PE-42 ground sleeves, eight single-phase switch stands, and thirteen hill holders, along with all required 2" and 3" elbows and sweeps. The contractor shall furnish all labor and equipment; the district will furnish all materials. Work must be performed in accordance with the district's specifications.

Opportunity text

Description: Contractor shall furnish all labor and equipment necessary to install approximately 18,060 linear feet of 1-2" HDPE primary conduit at a depth of 4 feet and 1,550 linear feet of 1-3" HDPE or Schedule 40 PVC secondary conduit at a depth of 3 feet. The work also includes installation of twenty-three (23) PE-36 hand holes, twenty-three (23) PE-42 ground sleeves, eight (8) single- phase switch stands, and thirteen (13) hill holders, including all required 2" and 3" elbows and sweeps. All materials will be furnished by Central Lincoln People's Utility District, and all work will be performed in accordance with the district's specifications.

Files

File Type Posted
Bid Notice-Hidden Valley Road_ Toledo.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity