HG&E Contract# 24-13 - Whitney Ave Bridge Gas Main Remediation

Closed State & local contract opportunity Posted

Solicitation number
BD-20-1895-HGE00-HGE01-101391
State
Massachusetts
Responses due

Opportunity facts

NIGP code
UNSPSC code

Opportunity details come from commbuys.com. Updated .

About this opportunity

This state and local contract opportunity is for the remediation of an existing gas main encased in a steel sleeve on the Whitney Ave bridge over I-91 in Massachusetts. The project, identified as HG&E Contract# 24-13, is being procured by the state of Massachusetts.

The project requires the remediation of the 200-foot intermediate pressure (IP) 6-inch coated steel gas main within the 10-inch steel sleeve, which has been identified as needing protection against atmospheric corrosion. The successful contractor will be responsible for delivering the required remediation services to address this issue. Evaluation criteria for the contract award have not been specified. The contract opportunity is posted with a due date of May 2, 2024.

There is no information provided regarding any set-aside designations or restrictions on the types of organizations that can respond to this opportunity. The current contractor or incumbent vendor is also not identified. The available budget or potential award value for this contract has not been disclosed.

Opportunity text

The existing bridge on Whitney Ave that runs over I-91 North & South carries approximately 200' of an Intermediate Pressure (IP) 6" coated steel gas main encased in a 10" steel sleeve. During a recent inspection, it was noted that the pipeline sleeve is in need of remediation to protect against atmospheric corrosion.