Helen Street Sanitary Sewer Replacement

Closed State & local contract opportunity Posted

Solicitation number
TR-13
State
Michigan
Responses due

Opportunity facts

Jurisdictions

Opportunity details come from bidnetdirect.com. Updated .

About this opportunity

The Helen Street Sanitary Sewer Replacement project is a municipal infrastructure procurement opportunity located in Wayne County, specifically in Warren City, Michigan. The project involves comprehensive sanitary sewer infrastructure improvements, including clearing and grubbing, removing existing infrastructure, and installing new sewer systems. Primary deliverables include removing and replacing approximately 250 linear feet of barb wire fence, removing and replacing 325 square yards of pavement, installing 725 linear feet of 10-inch diameter HDPE pipe via directional drilling, installing 500 linear feet of 6-10 inch diameter PVC Truss pipe through open cut methods, and reconnecting approximately 12 sewer leads. The bid deadline is set for August 27, 2024, at 10:00 A.M., with a pre-bid conference scheduled for August 20, 2024, at 10:00 A.M. at Trenton City Hall. Contractors must submit two copies of bid forms and a bid bond or certified check for 5% of the total bid amount, demonstrating financial capacity and commitment to the project.

While specific set-aside designations are not explicitly detailed in the provided documentation, contractors will be required to provide comprehensive evidence of qualifications, including demonstrated experience in similar municipal infrastructure projects. The project is expected to be completed by May 30, 2025, with substantial completion targeted for January 31, 2024. Although precise budget ranges are not specified, the comprehensive nature of the infrastructure work suggests a significant municipal investment. The procurement appears to be open to qualified contractors who can meet the technical specifications and installation requirements outlined in the contract documents. Funding appears to be municipal, with the City of Trenton as the project owner, and the contract includes provisions for progress payments with defined retainage and payment terms. Interested contractors should carefully review the detailed specifications in the Helen St. Specifications.pdf document to ensure full compliance with the project requirements.

Opportunity text

• Clearing, Grubbing, Trees and Shrubs Removal; • Flowable fill approximately 1,250 of sewer line, Less than 8 inch; • Remove and replace existing barb wire fence, approximately 250 linear feet; • Remove approximately 325 square yard of pavement and replace with 325 square yard of 6 inch non-reinf Conc Pvt, MDOT Grade P1 on new 6 inch MDOT 21AA Aggregate Limestone Base; • Furnish and install approximately 725 linear feet of sanitary sewer, 10 inch diameter HDPE pipe by directional drilling and associated manholes; • Furnish and install approximately 500 linear feet of sanitary sewer 6-10 inch diameter PVC Truss pipe by open cut and associated manholes; • Reconnect approximately 12 sewer leads; • All related items.

Files

File Type Posted
Helen St. Specifications.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity